![Ditch Witch JT1220 Mach 1 Скачать руководство пользователя страница 90](http://html1.mh-extra.com/html/ditch-witch/jt1220-mach-1/jt1220-mach-1_operators-manual_2510007090.webp)
JT1220 Mach 1 Operator’s Manual
Conduct a Bore - 89
Position Equipment
CMW
Position Equipment
1.
Review bore plan and select drilling unit position and fluid unit position. See “Select Start and End
Points” on page 63.
2.
Move equipment into selected positions.
Connect Fluid System
1.
Connect fluid hose from mixing system to drilling
fluid pump. A 1.5” (38 mm) or larger, non-collapsible
hose is required.
2.
Install y-strainer between mixing unit and drilling
fluid pump. Position strainer so that drilling fluid
flows in the direction of the arrow. In most cases,
positioning strainer at outlet of mixing unit gives
best results.
IMPORTANT: Clean y-strainer regularly. See
page 166.
Содержание JT1220 Mach 1
Страница 1: ...JT1220 Mach 1 Issue 2 1 Operator s Manual 054 114 CMW...
Страница 19: ...Safety 18 JT1220 Mach 1 Operator s Manual Emergency Procedures CMW...
Страница 75: ...Prepare 74 JT1220 Mach 1 Operator s Manual Check Supplies and Prepare Equipment CMW...
Страница 107: ...Conduct a Bore 106 JT1220 Mach 1 Operator s Manual Remove Pullback Device CMW...