![Ditch Witch JT1220 Mach 1 Скачать руководство пользователя страница 63](http://html1.mh-extra.com/html/ditch-witch/jt1220-mach-1/jt1220-mach-1_operators-manual_2510007063.webp)
Prepare - 62
JT1220 Mach 1 Operator’s Manual
Inspect Site
CMW
Inspect Site
Inspect jobsite before transporting equipment. Check for the following:
•
overall grade or slope
•
changes in elevation such as hills or open trenches
•
obstacles such as buildings, railroad crossings, or streams
•
signs of utilities (See “Inspect Jobsite” on page 64.)
•
traffic
•
access
•
soil type and condition
•
water supply
•
sources of locator interference (rebar, railroad tracks, etc.)
Take soil samples from several locations along bore path to determine best bit and backreamer
combinations.
Identify Hazards
Identify safety hazards and classify jobsite. See “Classify Jobsite” on page 64.
Jobsite hazards could cause death or serious injury. Use
correct equipment and work methods. Use and maintain proper safety
equipment.
NOTICE:
•
Wear personal protective equipment including hard hat, safety eye wear, and hearing protection.
•
Do not wear jewelry or loose clothing.
•
Notify One-Call and companies which do not subscribe to One-Call.
•
Comply with all utility notification regulations before digging or drilling.
•
Verify location of previously marked underground hazards.
•
Mark jobsite clearly and keep spectators away.
Remember, jobsite is classified by hazards in place -- not by line being installed.
Содержание JT1220 Mach 1
Страница 1: ...JT1220 Mach 1 Issue 2 1 Operator s Manual 054 114 CMW...
Страница 19: ...Safety 18 JT1220 Mach 1 Operator s Manual Emergency Procedures CMW...
Страница 75: ...Prepare 74 JT1220 Mach 1 Operator s Manual Check Supplies and Prepare Equipment CMW...
Страница 107: ...Conduct a Bore 106 JT1220 Mach 1 Operator s Manual Remove Pullback Device CMW...