JT1220 Mach 1 Operator’s Manual
Transport - 79
Lift
CMW
Procedure
Use a crane capable of supporting the equipment's size and weight. See “Specifications” on page 185 or
measure and weigh equipment before lifting.
1.
Attach chains to four lift points (two on each side of drilling unit).
2.
Install spacer blocks (shown) between the chain and the drilling unit as shown above.
3.
Attach each chain securely to cross members.
4.
Bring chains together to a central pull point.
IMPORTANT: Length of spreader bars should be equal to width of drilling unit.
Содержание JT1220 Mach 1
Страница 1: ...JT1220 Mach 1 Issue 2 1 Operator s Manual 054 114 CMW...
Страница 19: ...Safety 18 JT1220 Mach 1 Operator s Manual Emergency Procedures CMW...
Страница 75: ...Prepare 74 JT1220 Mach 1 Operator s Manual Check Supplies and Prepare Equipment CMW...
Страница 107: ...Conduct a Bore 106 JT1220 Mach 1 Operator s Manual Remove Pullback Device CMW...