![Ditch Witch JT1220 Mach 1 Скачать руководство пользователя страница 85](http://html1.mh-extra.com/html/ditch-witch/jt1220-mach-1/jt1220-mach-1_operators-manual_2510007085.webp)
Transport - 84
JT1220 Mach 1 Operator’s Manual
Haul
CMW
Unload
With Tiedown Kit
1.
Lower ramps.
2.
Remove tiedowns.
3.
Start drilling unit engine.
4.
Raise stabilizers.
5.
Move drilling unit forward until track meets chock.
6.
Raise drill frame.
7.
Slow engine to low throttle and slowly back unit down trailer or ramps.
Without Tiedown Kit
1.
Lower ramps.
2.
Remove tiedowns.
3.
Start drilling unit engine.
4.
Raise stabilizers.
5.
Raise drill frame.
6.
Slow engine to low throttle and slowly back unit down trailer or ramps.
Unhitch Trailer
1.
Stop tow vehicle and trailer on level ground.
2.
Put manual transmission into first or reverse gear or automatic transmission into park. Turn off ignition.
Set parking brake.
3.
Block trailer wheels.
4.
Reverse “Hitch Trailer “ steps to unhitch trailer from tow vehicle.
Crushing weight. If load falls or moves it could kill or crush you. Use
proper procedures and equipment or stay away.
NOTICE:
•
Load and unload trailer on level ground.
•
Ensure trailer wheels are blocked.
•
Attach trailer to vehicle before loading or unloading.
Содержание JT1220 Mach 1
Страница 1: ...JT1220 Mach 1 Issue 2 1 Operator s Manual 054 114 CMW...
Страница 19: ...Safety 18 JT1220 Mach 1 Operator s Manual Emergency Procedures CMW...
Страница 75: ...Prepare 74 JT1220 Mach 1 Operator s Manual Check Supplies and Prepare Equipment CMW...
Страница 107: ...Conduct a Bore 106 JT1220 Mach 1 Operator s Manual Remove Pullback Device CMW...