![Ditch Witch JT1220 Mach 1 Скачать руководство пользователя страница 120](http://html1.mh-extra.com/html/ditch-witch/jt1220-mach-1/jt1220-mach-1_operators-manual_2510007120.webp)
JT1220 Mach 1 Operator’s Manual
Systems and Equipment - 119
Drilling Fluid
CMW
Drilling Fluid Requirements
1.
Determine drilling conditions and choose appropriate drilling fluid mix.
2.
Estimate amount of supplies needed and check availability.
•
Drilling fluid
•
Water supply. If more water than can be carried with the unit will be needed, arrange to transport
additional water.
•
Bentonite and/or polymer
3.
Check water quality.
•
Use meter or pH test strips to test pH of water. If pH is below 9.0, add 1 lb (454 g) soda ash per
tank. Test and repeat until pH is between 9 and 10.
•
Check water hardness using hardness test strips. Treat with soda ash if hardness exceeds 125
ppm.
Содержание JT1220 Mach 1
Страница 1: ...JT1220 Mach 1 Issue 2 1 Operator s Manual 054 114 CMW...
Страница 19: ...Safety 18 JT1220 Mach 1 Operator s Manual Emergency Procedures CMW...
Страница 75: ...Prepare 74 JT1220 Mach 1 Operator s Manual Check Supplies and Prepare Equipment CMW...
Страница 107: ...Conduct a Bore 106 JT1220 Mach 1 Operator s Manual Remove Pullback Device CMW...