![Ditch Witch JT1220 Mach 1 Скачать руководство пользователя страница 101](http://html1.mh-extra.com/html/ditch-witch/jt1220-mach-1/jt1220-mach-1_operators-manual_2510007101.webp)
Conduct a Bore - 100
JT1220 Mach 1 Operator’s Manual
Record Bore Path
CMW
Drill Head Position
The drill head position is determined by reading
beacon roll. Roll is displayed as a clock face
position.
1.
Read beacon roll.
2.
Slowly rotate pipe until locator displays desired
beacon roll.
To change direction:
1.
Rotate pipe to clock position you intend to travel.
2.
Push pipe into ground.
To move forward without changing direction:
Rotate pipe into ground.
Record Bore Path
Locate drill head every half-length of pipe. As the job is completed, record the actual data for each drill
pipe. List pitch and depth of each joint and a brief description of the procedure. In addition, draw a simple
sketch of the site and record depth and rough location of pullback.
The Trac Management System Plus is also available for plotting and tracking your bore path. It utilizes the
Subsite 750 Tracker, 750 Display, a tracking beacon, and special software. The display can store jobs in
its memory or the system can be run in the field using a laptop computer equipped with the Windows
®
95
or higher operating system. See your Ditch Witch dealer for details.
Содержание JT1220 Mach 1
Страница 1: ...JT1220 Mach 1 Issue 2 1 Operator s Manual 054 114 CMW...
Страница 19: ...Safety 18 JT1220 Mach 1 Operator s Manual Emergency Procedures CMW...
Страница 75: ...Prepare 74 JT1220 Mach 1 Operator s Manual Check Supplies and Prepare Equipment CMW...
Страница 107: ...Conduct a Bore 106 JT1220 Mach 1 Operator s Manual Remove Pullback Device CMW...