UltiMate 3000 Nano and Cap- System Installation and Application
12
•
Prepare the individual modules as described in the
Operating Instructions
for the respective
instrument.
•
Connect the modules on the rear panel as described in Rear Panel Connectors (
→
•
For examples of the fluid connections between the system modules, refer to Application
Examples and Fluid Connections (
→
•
Use the power cords shipped with the instruments to connect the units to the mains. Turn on
the instruments by pressing the power switch on the rear panel.
Содержание UltiMate 3000
Страница 1: ...UltiMate 3000 Nano and Cap System Installation and Application Revision 1 0 Date May 2006 2006 Dionex...
Страница 2: ...UltiMate 3000 Nano and Cap System Installation and Application...
Страница 10: ...UltiMate 3000 Nano and Cap System Installation and Application 6...
Страница 60: ...UltiMate 3000 Nano and Cap System Installation and Application 56...
Страница 66: ...UltiMate 3000 Nano and Cap System Installation and Application 62...
Страница 72: ...UltiMate 3000 Nano and Cap System Installation and Application 68...