UltiMate 3000 Nano and Cap- System Installation and Application
10
2.4 Preparing the System
Important:
The system modules are filled with 2-propanol or an isopropyl alcohol-to-
water mixture when being shipped from the factory. During initial
operation of the modules, make sure that the solvents used are miscible.
Otherwise, use an appropriate intermediate solvent.
Important:
Les instruments dans un système UltiMate 3000 sont stockés sous 2-
propanol ou isopropanol et eau. Lors du démarrage initial des instruments,
assurez-vous que les solvants utilisés soient miscibles. Sinon, suivez les
étapes intermédiaires appropriées.
•
Observe the information about the facility requirements when installing the system.
•
Connect the drain tubing from the devices' accessories kits to the outlet of the modules to
direct liquids that might have gathered in the enclosure to the waste. To do so, you must cut
the tubing to appropriate lengths (see table below). The outlets are on the bottom right of the
devices.
Please note:
You may connect the tubing as shown in Fig. 3. To do so, use the
connecting pieces from the devices' accessories kits.
Fig. 3: Connecting drain tubing
*
In addition to the outlets
described above, the flow
manager and the solvent rack
are equipped with another
outlet on the rear panel
(
→
note, page 11).
*
*
Connect the connecting pieces
and tubing on these outlets.
Additional outlet on the
WPS-3000T autosampler
Additional outlet on the
flow manager
Содержание UltiMate 3000
Страница 1: ...UltiMate 3000 Nano and Cap System Installation and Application Revision 1 0 Date May 2006 2006 Dionex...
Страница 2: ...UltiMate 3000 Nano and Cap System Installation and Application...
Страница 10: ...UltiMate 3000 Nano and Cap System Installation and Application 6...
Страница 60: ...UltiMate 3000 Nano and Cap System Installation and Application 56...
Страница 66: ...UltiMate 3000 Nano and Cap System Installation and Application 62...
Страница 72: ...UltiMate 3000 Nano and Cap System Installation and Application 68...