![Dinolift DINO 280RXT Скачать руководство пользователя страница 54](http://html1.mh-extra.com/html/dinolift/dino-280rxt/dino-280rxt_operating-instructions-manual_2505811054.webp)
54
Operating instructions • DINO 280RXT
5.4. LONG-TERM STORAGE
Clean the machine carefully. Lubricate and apply protective grease to it before putting it into
storage for a longer period of time. Repeat the cleaning and lubrication procedures before
putting the lift back in operation.
The periodic inspections must be executed following the steps described in the instructions.
5.5. INSTRUCTIONS FOR TRANSPORT
The lift must be in the transport position when lifting, towing or tying it down for transport.
All lugs for lifting and tying down are marked in the machine.
Remove all loose material from the top of the frame structures and the work platform.
All protective covers must be closed and locked. Turn the key switch to “O”, disconnect the
lift from external power supply and turn the main power OFF.
5.5.1. Tying down
Tie down the lift at four (4) tying down points on the chassis. Also tie down the boom to
stabilize the turning device and jib arms.
DANGER
WARNING
CAUTION
NOTICE
Risk of falling! Tie down the lift to the vehicle for the transport. The chassis of the lift is
fitted
with specific, marked lugs for tying. To avoid structural damage, use only the marked
tying
points.
Содержание DINO 280RXT
Страница 2: ...2 Operating instructions DINO 280RXT...
Страница 6: ...6 Operating instructions DINO 280RXT...
Страница 11: ...11 2 2 REACH DIAGRAM 120 kg 230 kg...
Страница 63: ...63 NOTES...
Страница 71: ...71 BLANK...
Страница 73: ...73 NOTES...
Страница 74: ...74 Operating instructions DINO 280RXT NOTES...