49
5.2.5. Measures to be taken at the end of the working day
At the end of a workday:
1. Retract the telescope completely.
2. Check that the platform is perpendicular to the boom.
3. Lower the boom onto the support.
The limit switch on the transport support prevents operation of the stabilisers if the
platform is not down
4. Close the cover on the platform control panel.
5.
Turn the key switch to position “0”.
6. Turn the main switch off
7. Make sure that the covers are locked.
5.2.6. Special instructions for winter use
The lowest allowed operating temperature of the lift is -20 °C
In cold conditions do the following special actions in addition to normal start-up procedure.
1. if the temperature is below zero, let the power unit run for a few minutes before starting
the movements
2. start with a few movements to warm-up oil in the cylinders and to ensure proper operation
of the valves
3. check that the limit switches and the emergency descent devices are operational and
clean (from dirt, snow, ice, etc.)
4. protect the control panel and the platform from snow and ice whenever they are not in
use
Always keep the lift free from dirt, snow, ice, salt, etc. Accumulation of grit may
cause malfunctions, paint damage, corrosion and excessive wear of components
and structures.
Содержание DINO 280RXT
Страница 2: ...2 Operating instructions DINO 280RXT...
Страница 6: ...6 Operating instructions DINO 280RXT...
Страница 11: ...11 2 2 REACH DIAGRAM 120 kg 230 kg...
Страница 63: ...63 NOTES...
Страница 71: ...71 BLANK...
Страница 73: ...73 NOTES...
Страница 74: ...74 Operating instructions DINO 280RXT NOTES...