37
5.
OPERATION
5.1. START-UP
All the regular servicing measures must be carried out before using the lift.
DANGER
WARNING
CAUTION
NOTICE
The operator must do a worksite inspection and daily maintenance:
• at the beginning of each workday
• before operating the lift at a new worksite
• when the operator changes in the middle of a workday
5.1.1. Worksite inspection
1. General information
• Is the lift suited for the intended job?
•
Is the performance of the lift sufficient for the job? (reach, loadability etc.)
•
Is the lighting on the worksite sufficient?
• Is the position of the lift safe?
• Is the terrain suitable for using the lift (evenness and load-bearing capacity)?
Soil material
Density
Max. ground pressure
kg/cm²
Gravel
High density
6
Medium density
4
Loose
2
Sand
High density
5
Medium density
3
Loose
1.5
Fine sand
High density
4
Medium density
2
Loose
1
Sand/ mud
High density (very hard to work)
1.00
Medium density (hard to work)
0.50
Loose (easily worked)
0.25
DANGER
WARNING
CAUTION
NOTICE
Risk of overturning! Do not use on soft or unstable ground.
Содержание DINO 280RXT
Страница 2: ...2 Operating instructions DINO 280RXT...
Страница 6: ...6 Operating instructions DINO 280RXT...
Страница 11: ...11 2 2 REACH DIAGRAM 120 kg 230 kg...
Страница 63: ...63 NOTES...
Страница 71: ...71 BLANK...
Страница 73: ...73 NOTES...
Страница 74: ...74 Operating instructions DINO 280RXT NOTES...