background image

28

Tower

7.4

dTower operation

dTower

R will always be the master module in the blockage. In this module the

controller board is installed

it is responsible for controlling the operation of the

blockage.

7.4.1

Controller board

The controller board has the function of controlling user passage, pictogram, sensors,
and all system logic, receiving signals from the access controller board.

7.1.1 Functions

dTower

has many features, some of them customizable through switches DS1 and DS2

located on the controller board.

To program DS1, put each pin in the desired position, according to the table below:

NOTE

-

The grey squares (in bold) in the table above show the standard

configuration, that is, factory settings.

WARNING
To reduce the risk of electric shock, before maintenance, turn off the
power of the equipment by moving the circuit breaker key to the
position OFF. Leave all maintenance services to qualified technical
professionals.

Switch

1

2

3

4

5

6

7

8

Enables sound signal for invasion

ON

Disables sound signal for invasion

OFF

Entry signal for enabling: NO contact

ON

Entry signal for enabling: NC contact

OFF

Allows invasion

ON

Does not allow invasion

OFF

Enables clear access for entry (keep in OFF)

ON

Disables clear access for entry (keep in OFF)

OFF

Enables clear access for exit (keep in OFF)

ON

Disables clear access for exit (keep in OFF)

OFF

Sound alarm 2s before closing

ON

Disables sound alarm 2s before closing

OFF

No maximum time – waits for valid passage

ON ON

Maximum time of 5 seconds

OFF ON

Maximum time of 10 seconds

ON OFF

Maximum time of 15 seconds

OFF OFF

DIP SWITCH DS1

Содержание dTower

Страница 1: ...1 11 Produ t Manual c Tower...

Страница 2: ...2...

Страница 3: ...sage by disk emulation and passage by pulse Exclusion of energy meter drawing DIP table update Alteration of pulse time 11 March 10 2020 Leandro Dandolini Vin cius Duarte Jorge Grass Layout alteration...

Страница 4: ...any language or computer language in any electronic magnetic optical chemical manual way or otherwise without express written permission from Digicon S A Code 069 31 221 Revision 11 English This manu...

Страница 5: ...ion between blockages 7 3 Connection of control signs 7 4 dTower operation 7 4 1 Controller board 7 4 2 Functions 7 4 2 1 Configurable functions via input 7 4 2 2 Configurable functions via Ds1 7 4 2...

Страница 6: ...understand the processes of installation operations maintenance and unboxing Correct installation and maintenance ensure equipment operation and increase the useful life of its components Correct equ...

Страница 7: ...efully read the safety and operation instructions before using this equipment and keep them for future reference Carefully follow instructions and warnings Follow the instructions of operation and use...

Страница 8: ...ng the equipment in operation again 2 2 Installation site When selecting the installation site meet the following standards Protective grounding The protective grounding of the building s electrical i...

Страница 9: ...rs of this equipment to perform maintenance unless the product manual requires so Leave all maintenance services to qualified technical professionals Humidity Do not allow humidity to enter this equip...

Страница 10: ...out previous notice Digicon does not provide any contractual warranty concerning the information in this manual and cannot be held responsible for errors it may contain and problems due to its use The...

Страница 11: ...for both directions _ Offers sound signal beep for customizable access control _ Doors with bidirectional movement _ Inputs for activation sensors that open or close the doors _ Optional card collect...

Страница 12: ...only in the opposite direction represent passage not cleared LED lights flashing green indicating the direction of passage represent passage cleared B Orientation pictogram front The orientation pict...

Страница 13: ...he equipment from its box not to damage it 6 2 Pre installation Before starting installation of the floor where the equipment will be installed dTower must be ready The built in boxes must be installe...

Страница 14: ...so to have a small space between them of about 30mm Such space is important to ensure that even closed the door will not injure the user Built in Boxes 4 x4 Conduits with 50 mm diameter Transmitter R...

Страница 15: ...s or through chemical anchorage For mechanical bolts minimum floors thickness should be 100mm In case of floors with less than 100mm thickness or special floors use chemical anchorage NOTE To facilita...

Страница 16: ...e 5 Attach the threaded bar to the drill and screw it until it reaches the bottom of the hole or until the mark of the threaded bar is leveled with the ground 6 Apply the drill until the chemical mate...

Страница 17: ...17 Tower NOTE We recommend using chemical anchorage however if you prefer parabolts make sure the floor is adequate...

Страница 18: ...the screw inside the fastener hole 2 place it in the door hole 4 3 With the three parts fitted fix them to the equipment engine 5 4 With the upper part fixed place the screw 3 on the lower part going...

Страница 19: ...blue and yellow circles Blue Identify passage for people with special needs PNE with a passage space of 920mm Yellow Identify passage for people with special needs with a passage space of 520mm NOTE U...

Страница 20: ...troller board connection terminals AC terminals circuit breaker and power supply Lock for opening upper cover Lock for opening access door Tower WARNING Avoid electric shock Opening or removing the do...

Страница 21: ...nterconnection signal cable and DC charge dTower Insert connectors CN4 CN5 and CN6 in their respective places according to printing on interconnection board of dTower T Tower WARNING To reduce the ris...

Страница 22: ...identifying where each cable must be connected NOTE Separate the electric network from the logical network NOTE Digicon provides interconnection cables with 3 meters of length The depth of the ducts...

Страница 23: ...re below Digicon recommends using the norm NBR 5410 as reference for electrical installations of equipment pieces Power cables of power supply must be connected to the circuit breaker and the ground c...

Страница 24: ...ce the risk of electric shock before maintenance turn off the power of the equipment by moving the circuit breaker key to the position OFF Leave all maintenance services to qualified technical profess...

Страница 25: ...positive voltage Enabling solid state negative 654321 Vdc Vdc VDC 5 24V Integrator controller Controller board Controller board 54321 Vdc Vdc 5 24V Integrator controller Tower Enab exit Enab entry En...

Страница 26: ...in ON d Confirming passage Negative Tower Integrator controller 4321 Negative digital input Controller board Integrator controller Vdc 4321 Positive digital input U U U U U NA NF Rl2 3 4 NA NF 1 2 Rl1...

Страница 27: ...ical counter in order to count the passage flow in the direction of entry of the equipment Similarly the output Rl2 can be used to count the passage flow in the direction of exit Confirmation of passa...

Страница 28: ...y settings WARNING To reduce the risk of electric shock before maintenance turn off the power of the equipment by moving the circuit breaker key to the position OFF Leave all maintenance services to q...

Страница 29: ...asion hitchhiking or withdrawal and will signal it according to its interpretation Switch 1 2 3 4 5 6 7 8 Final time to close door 0 50s ON ON Final time to close door 1 25s OFF ON Final time to close...

Страница 30: ...cycle a new passage will not be cleared that is the signal needs to be turned off during 20ms NOTE This feature also depends on the ability of the access management system to support a queue for conse...

Страница 31: ...blink indefinitely This mode remains active while the enabling signals for entry and exit are present b Bidirectional clearance In this mode the equipment waits for user interaction to know in which d...

Страница 32: ...vents occur Invasion by any side of the blocked area with the door closed Invasion contrary to the direction cleared for passage with the door open Hitchhiker user b NO and NC contact Selection DS1 P2...

Страница 33: ...the equipment cleared in a certain direction entry or exit It can also be used as a test to check on the door operation When DS1 P4 is active the door will open for entry and will remain thus until di...

Страница 34: ...minimum and maximum times are respectively 0 5 and 10 seconds The SmartSpeed function operates correctly since the passage speed is constant b Validation accumulation Access queue Selection DS2 P3 Wi...

Страница 35: ...the clips It allows user passage confirmation through the passage gap To identify this event the equipment generates a small door movement invitation and waits for the user to signal their intention o...

Страница 36: ...Measures are provided in millimeters and inches 400 15 748 160 6 299 1 5 0 5 9 0 1 2 5 0 4 9 2 920 520 36 220 20 472 225 8 858 311 12 244 939 36 968 992 39 055 Tower 8 Technical characteristics 8 1 Di...

Страница 37: ...VDC 5 A 5 one source per module Frequency 50 60 Hz Average time for opening closing door According to configuration Operating temperature 0 C e 50 C Approx weight 100 kg per packaged module Tower 127...

Страница 38: ...nternal dTower R DC powering Check status LED lights of supply to dTower T interconnection board Check CN6 connector of dTower R and T interconnection cable When dTower turns on the breaker immediatel...

Страница 39: ...erconnection board and CN1 on engine control board Connections between engine and engine control board Connections between engine and engine control board Mechanical brake of dTower door Connection of...

Страница 40: ...off Control or supply cable disconnected Check connection of CN3 on dTower control board Check CN3 and CN8 on dTower R interconnection board Check connection of CN1 on dTower upper pictogram Check 5V...

Страница 41: ...ide and upper LED lights activation 1x 6 months Analyze activation of entry and exit pictogram 1x 6 months Analyze activation of buzzer through validations and invalid entries 1x 6 months Check 24V vo...

Страница 42: ...of Preventive Maintenance Tower Manufacturer Company Digicon S A Contacts 55 51 3489 7000 www digicon com br Product Model Code Serial number Installation Company Contacts Date Action Date Responsible...

Страница 43: ...or organic solvent Be careful never scrape the stainless steel surface with blades spatulas or rough abrasives Rust stains with a cotton swab moistened with water and nitric acid 10 apply topically ma...

Страница 44: ...spread this solution with cloth in only one direction the direction of the water flow Do not make circular movements with the cloth Rinse well and repeat the process until the result is satisfactory D...

Страница 45: ...for repairs or technical assistance 3 Warranty shall be granted to the buyer only in the face of the bill of sale original or copy 4 Warranty does not apply in the following cases or conditions a defe...

Страница 46: ...46 Notes Tower...

Страница 47: ...47 Tower...

Страница 48: ...ZIP CODE 94045 420 Sales 0xx51 3489 8700 3489 8745 Technical Assistance 0xx51 3489 8903 E mail vendas acesso digicon com br Office S o Paulo Development Technical Assistance Sales Rua S o Paulo 82 Alp...

Отзывы: