16
Tower
NOTE
-
Digicon meets the norm ABNT NBR 9050: Accessibility to buildings,
furniture, space, and urban equipment
.
Step-by-step:
1. Use the 12mm (0,47'') drill to drill the hole with depth of 90mm (Threaded bar M10);
2. Clean the hole with an air blower or a vacuum to remove any debris.
3. Place the threaded bar inside the hole and measure the depth. The bar has a mark
that must be leveled with the ground;
4. Place the HVU capsule inside the hole;
5. Attach the threaded bar to the drill and screw it until it reaches the bottom of the hole
or until the mark of the threaded bar is leveled with the ground;
6. Apply the drill until the chemical material rises to the surface;
7. Do not touch the threaded bar until the chemical reaction is over (10min);
8. Curing time according to the table:
Free span for passage:
90°
70
(2,755")
90°
285
(11,220")
Long door
Short door
Data according to ETA 05/0255/0256/0257, edition 2010-03-01 / 2006-01-20
Base material temperature
Curing time necessary for the fixing to
receive total load t
cure
20°C to 40°C
20min
10°C to 19°C
30min
0°C to 9°C
1h
-5°C to -1°C
5h
Содержание dTower
Страница 1: ...1 11 Produ t Manual c Tower...
Страница 2: ...2...
Страница 46: ...46 Notes Tower...
Страница 47: ...47 Tower...