41
Tower
10.
Preventive maintenance
To estimate the intervals between preventive maintenances, we assumed 1600
passages/day in a 30-day month. These are reference values and can change according
to the utilization mode of each customer, who then must make the necessary changes to
obtain their own results.
Calculation basis:
Leave all maintenance services for qualified technical professionals.
Action
Frequency
Calibrate doors
1x / 3 months
Analyze door operation, looking for noises, heavy mechanisms, and
non-standard activations
1x / 6 months
Analyze side and upper LED lights activation
1x / 6 months
Analyze activation of entry and exit pictogram
1x / 6 months
Analyze activation of buzzer through validations and invalid entries
1x / 6 months
Check 24V voltage in engine supplies
1x / 6 months
Check operation of door mechanical brakes
1x / 6 months
Check operation of biometric reader(s)
1x / 6 months
Check operation of non-contact card reader(s)
1x / 6 months
Check operation of card collecting box
1x / 6 months
Check operation of display
1x / 6 months
Check operation of screws that fixate doors
1x / 6 months
Check operation of bearings
1x / 10 months
Visually check the cotters
1x / 6 months
Check operation of engine
1x / 22 months
Visually check door conditions
1x / 6 months
Check operation of locks
1x / 22 months
Содержание dTower
Страница 1: ...1 11 Produ t Manual c Tower...
Страница 2: ...2...
Страница 46: ...46 Notes Tower...
Страница 47: ...47 Tower...