1.1 Unpacking
Check
After receiving the AC servo drive, please check for the following:
Ensure that the product is what you have ordered.
Verify the part number indicated on the nameplate corresponds with the part number of your order
(Please refer to Section 1.2 for details about the model explanation).
Ensure that the servo motor shaft rotates freely.
Rotate the motor shaft by hand; a smooth rotation will indicate a good motor. However, a servo motor
with an electromagnetic brake can not be rotated manually.
Check for damage.
Inspect the unit to insure it was not damaged during shipment.
Check for loose screws.
Ensure that all necessary screws are tight and secure.
If any items are damaged or incorrect, please inform the distributor whom you purchased the product from or
your local Delta sales representative.
A complete and workable AC servo system should be including the following parts:
Part I : Delta standard supplied parts
(1) Servo
drive
(2) Servo
motor
(3) Quick
Start
Part II : Optional parts, not Delta standard supplied part (Refer to Appendix A)
(1) One power cable, which is used to connect servo motor and U, V, W terminals of servo drive. This
power cable is with one green grounding cable. Please connect the green grounding cable to the
ground terminal of the servo drive.
(2) One encoder cable, which is used to connect the encoder of servo motor and CN2 terminal of servo
drive.
(3) CN1 Connector: 25 PIN Connector (D-sub Connector)
(4) CN2 Connector: 9 PIN Connector (D-sub Connector)
(5) CN3 Connector: 8 PIN Connector (DIN Cable Mount Male)
Содержание ASD-B0121-A
Страница 1: ......
Страница 13: ...Table of Contents ASDA B Series Revision January 2009 This page intentionally left blank...
Страница 18: ...Chapter 1 Unpacking Check and Model Explanation ASDA B Series Revision January 2009 1 5 ECMA Series Servo Motor...
Страница 53: ...Chapter 3 Connections and Wiring ASDA B Series 3 28 Revision January 2009 3 6 2 Speed Control Mode...
Страница 54: ...Chapter 3 Connections and Wiring ASDA B Series Revision January 2009 3 29 3 6 3 Torque Control Mode...
Страница 55: ...Chapter 3 Connections and Wiring ASDA B Series 3 30 Revision January 2009 This page intentionally left blank...
Страница 72: ...Chapter 4 Display and Operation ASDA B Series Revision January 2009 4 17 Figure 4 7...
Страница 75: ...Chapter 4 Display and Operation ASDA B Series 4 20 Revision January 2009 Figure 4 9...
Страница 77: ...Chapter 4 Display and Operation ASDA B Series 4 22 Revision January 2009 Figure 4 10...
Страница 79: ...Chapter 4 Display and Operation ASDA B Series 4 24 Revision January 2009 Figure 4 11...
Страница 92: ...Chapter 4 Display and Operation ASDA B Series Revision January 2009 4 37 Figure 4 21...
Страница 93: ...Chapter 4 Display and Operation ASDA B Series 4 38 Revision January 2009 This page intentionally left blank...
Страница 115: ...Chapter 5 Trial Run and Tuning Procedure ASDA B Series 5 22 Revision January 2009 This page intentionally left blank...
Страница 255: ...Chapter 9 Maintenance and Inspection ASDA B Series 9 4 Revision January 2009 This page intentionally left blank...
Страница 277: ...Chapter 11 Specifications ASDA B Series 11 10 Revision January 2009 11 4 Servo Motor Speed Torque Curves T N Curve...
Страница 291: ...Chapter 12 Application Examples ASDA B Series 12 2 Revision January 2009 PLC Program...
Страница 292: ...Chapter 12 Application Examples ASDA B Series Revision January 2009 12 3...
Страница 293: ...Chapter 12 Application Examples ASDA B Series 12 4 Revision January 2009...
Страница 296: ...Chapter 12 Application Examples ASDA B Series Revision January 2009 12 7 HMI DOP A HMI Program Screen Homing Operation...
Страница 297: ...Chapter 12 Application Examples ASDA B Series 12 8 Revision January 2009 Position Control 1...
Страница 298: ...Chapter 12 Application Examples ASDA B Series Revision January 2009 12 9 Position Control 2...
Страница 299: ...Chapter 12 Application Examples ASDA B Series 12 10 Revision January 2009 JOG Operation...
Страница 302: ...Chapter 12 Application Examples ASDA B Series Revision January 2009 12 13...
Страница 305: ...Chapter 12 Application Examples ASDA B Series 12 16 Revision January 2009 Connecting to Delta DVP 01PU...
Страница 306: ...Chapter 12 Application Examples ASDA B Series Revision January 2009 12 17 Connecting to Mitsubishi FX1PG...
Страница 307: ...Chapter 12 Application Examples ASDA B Series 12 18 Revision January 2009 Connecting to Mitsubishi FX2N1PG...
Страница 308: ...Chapter 12 Application Examples ASDA B Series Revision January 2009 12 19 Connecting to Mitsubishi AD75...
Страница 309: ...Chapter 12 Application Examples ASDA B Series 12 20 Revision January 2009 This page intentionally left blank...