Figure 17. Removing the PEM
1.
processor expansion module
2.
release lever
3.
If you are removing the PEM permanently, install a filler bracket over the QPI connector and install a cooling shroud.
NOTE: You must install a filler bracket over the QPI connector to maintain the Federal Communications Commission
(FCC) certification of the system. The filler bracket keeps dust and dirt out of the system.
4.
To install the filler bracket, align the notches on the filler bracket with the standoffs on the QPI connector and press the filler
bracket into place.
64