TrioPure
TM
Sanitation System
6
2e-3 Plumbing Configurations (Continued)
Figure 5 -
(Existing Pool, Pool Spa Combination, No ICS, No solar):
· Manifold to be plumbed in the pool return after the 3 way valve that diverts water between the pool and spa.
· Return from TrioPure
TM
plumbed back into the bypass manifold.
· Del recommends installing 2 cm (¾”) ball valves on the inlet and outlet of the Triopure to facilitate Salt Cell removal for
cleaning and a ball valve after the Bypass Manifold to control water flow through the Salt Cell.
F
igure 6 -
(Existing Pool, Pool Spa Combination, ICS, No solar):
· Manifold to be plumbed in the pool return after the 3 way valve that diverts water between the pool and spa.
· Return from TrioPure
TM
plumbed to the line of the ICS that goes to the lowest point of the pool.
- This is after the ICS diverter valve.
- A light duty check valve must be placed between the diverter valve and the point where the TrioPure
TM
enters the
ICS line.
· Del recommends installing 2 cm (¾”) ball valves on the inlet and outlet of the Triopure to facilitate Salt Cell removal for
cleaning and a ball valve after the Bypass Manifold to control water flow through the Salt Cell.
J
J
POOL
SPA
J
J
POOL
SPA
ICS
TrioPure
TM
TrioPure
TM
DEL Ozone · San Luis Obispo, CA 93401 · USA · 800-676-1335 · Fax: 805-541-8459
Содержание TrioPure 25
Страница 30: ......