© Danfoss 05-2011
AK-EM 100 Installation Guide
10
RC8BX402
1.4.2 Network Comms
The next stage is to start the data collection from the available controllers.
1. To start gathering the data to the AK-EM 100, press the
‘
Start’ button to connect and run the available
alarm, configuration, and data runs.
2. These will connect and run continuously according to each upload interval. The status will change to
Running
, and will remain so until stopped.
3. When the whole procedure is completed successfully, then the Network Communications section
should look like the image below, where the connection to the Gateway is continually running and
the assets have been initialised.
4. Repeat procedures for all other gateways.