
SiBE18-821_C
BP Unit
Removal Procedure
457
2.2
Removal of Electronic Expansion Valve Coils
Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure
Points
1
Detach the clamp of the
wire harnesses.
Preparation
Remove the PCB assembly
according to the “Removal of
PCB Assembly”.
2
Remove the 4 screws
and remove the
electrical component
mounting plate.
3
Remove the 4 screws
and remove the bottom
plate.
(Q0509)
(R9272)
(R12991)
Electrical component mounting plate
(R12992)
Bottom plate
Содержание Super Multi Plus E-Series BPMKS967B2B
Страница 1: ...Service Manual E Series SiBE18 821_C Applied Models Super Multi Plus Heat Pump...
Страница 13: ...SiBE18 821_C List of Functions 1 Part 1 List of Functions 1 Functions 2...
Страница 264: ...SA Indoor Unit FFQ FCQ FDBQ FBQ FHQ Series SiBE18 821_C 252 Operation Manual 2 Start 5s 5s 5s 5s 5s End...
Страница 471: ...SiBE18 821_C BP Unit Removal Procedure 459 Step Procedure Points Clamps Q0529...
Страница 491: ...Revision History Date News No Contents 2010 11 9 M 10013 Correction of troubleshooting flowchart AF for SkyAir models...