
BP Unit
SiBE18-821_C
454
Removal Procedure
2. BP Unit
2.1
Removal of PCB Assembly
Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure
Points
1
Remove the 4 screws
and remove the
electrical box cover.
2
The PCB is as shown at
the right. Disconnect all
the relay cables.
The PCB is waterproof with
resin. This means that the
fuse and varistor cannot be
replaced.
When reassembling, have
test operation for checking
wrong wiring.
Refer to page 30 for detail.
(Q0501)
(Q0502)
Содержание Super Multi Plus E-Series BPMKS967B2B
Страница 1: ...Service Manual E Series SiBE18 821_C Applied Models Super Multi Plus Heat Pump...
Страница 13: ...SiBE18 821_C List of Functions 1 Part 1 List of Functions 1 Functions 2...
Страница 264: ...SA Indoor Unit FFQ FCQ FDBQ FBQ FHQ Series SiBE18 821_C 252 Operation Manual 2 Start 5s 5s 5s 5s 5s End...
Страница 471: ...SiBE18 821_C BP Unit Removal Procedure 459 Step Procedure Points Clamps Q0529...
Страница 491: ...Revision History Date News No Contents 2010 11 9 M 10013 Correction of troubleshooting flowchart AF for SkyAir models...