
Field Settings
SiBE18-821_C
152
Test Operation and Field Settings
2.1.5 Setting of Refrigerant Recovery Mode
When carrying out the refrigerant collection on site, fully open the respective expansion valve of
indoor and outdoor units
All indoor and outdoor unit’s operation are prohibited.
[Operation procedure]
(1) In “setting mode 2” with units in stop mode, set the item No.21 (refrigerant recovery /
vacuuming mode) to ON. The respective expansion valve of indoor and outdoor units are
fully opened. “TEST OPERATION” and “UNDER CENTRALIZED CONTROL” are displayed
on the remote controller, and the indoor / outdoor unit operation is prohibited. After setting,
do not cancel “setting mode 2” until completion of refrigerant recovery operation.
(2) Collect the refrigerant using a refrigerant recovery unit. (See the instruction attached to the
refrigerant recovery unit for more detail.)
(3) Press the MODE button (BS1) once and return to “setting mode 2”.
Содержание Super Multi Plus E-Series BPMKS967B2B
Страница 1: ...Service Manual E Series SiBE18 821_C Applied Models Super Multi Plus Heat Pump...
Страница 13: ...SiBE18 821_C List of Functions 1 Part 1 List of Functions 1 Functions 2...
Страница 264: ...SA Indoor Unit FFQ FCQ FDBQ FBQ FHQ Series SiBE18 821_C 252 Operation Manual 2 Start 5s 5s 5s 5s 5s End...
Страница 471: ...SiBE18 821_C BP Unit Removal Procedure 459 Step Procedure Points Clamps Q0529...
Страница 491: ...Revision History Date News No Contents 2010 11 9 M 10013 Correction of troubleshooting flowchart AF for SkyAir models...