
Field Piping and Wiring
SiE25-110
34
Field Piping and Wiring
Precautions for Installation Work
Several dedicated tools are required for the installation work of R-407C models. Some of conventional tools can be used except tools
actually used to the installation work for R-22 models.
Tools
Tool name
Work process / Usage
Interchangeability with conventional tool
Pipe cutting
Interchangeable and can be used.
Interchangeable and can be used. (Be strictly sure that oil does
not flow in reverse to the unit during pump stop.)
Pipe flaring
Applying to flared section
Use dedicated ether oil, ester oil, alkyl-benzene oil or mixture of those oil.
Dedicated gauge is required due to high pressure.
Not required since charging work conducted with weighing scale.
Interchangeable and can be used.
Dedicated detector is required (Detector for R134a can be used).
For preventing refrigerant leakage and mixing of foreign matters,
dedicated charging hose is required.
Interchangeable and can be used.
Flare nut jointing
Pipe expanding in connection of pipe
Pipe bending
Oxidation proof for inside pipe
Refrigerant charging using
vacuum and operation check
Pipe brazing
Pipe cutter
Flaring tool
Refrigeration oil
Torque wrench
Pipe expander
Pipe bender
Nitrogen
Welder
Refrigerant
piping work
Air tight test
Gauge manifold
Charging hose
Charging cylinder
Weighing scale for
refrigerant charging
Gas leakage detector
Vacuum pump
From air tight test
to refrigerant
additional charging
Vacuum drying
Refrigerant additional charging
Gas leakage check
Since stricter caution should be necessary for R-407C to
prevent intrusion of foreign matters into the refrigerant piping
line, be sure to conduct N
2
blowing when brazing is required.
Other than brazing, a stricter work control including pipe
covering and drying is required to prevent pipe from intrusion of
foreign matters.
Joint brazing
Charge R-407C from service port at liquid side stop value of
outdoor unit in liquid phase. At that time, conduct vacuum
drying using vacuum pump.
Refrigerant charging
Make sure to conduct air-tightness test.
Air-tightness test
Make sure to conduct chamfering (filing) at cut section, since a
large wall thickness of pipe results large burr. Be aware of no
cutting chips left inside pipe.
Apply appropriate amount of refrigeration oil on outer / inner
surface of flared section to prevent leakage. Make sure to
use synthetic oil (ether oil, ester oil, archi-benzene oil or
mixture of those oils) as refrigeration oil.
Conduct installation work for R-407C model following above mentioned piping work procedure. Otherwise, unit
may have trouble. Refer to the "Work execution and control for R-407C model" for the details on handling of R-407C,
installation works and tools.
Flaring
Содержание SkyAir Super Inverter 70 D Series
Страница 11: ...SiE25 110 2...
Страница 15: ...Model Name and Power Supply SiE25 110 6 Model Name and Power Supply...
Страница 16: ...SiE25 110 Functions 7 Part 2 Functions 1 List of Functions 8 1 1 Functions 8...
Страница 31: ...Specifications SiE25 110 22 Specifications...
Страница 35: ...Wired Remote Controller SiE25 110 26 Remote Controller 1 2 Installation...
Страница 36: ...SiE25 110 Wired Remote Controller Remote Controller 27...
Страница 39: ...Wireless Remote Controller SiE25 110 30 Remote Controller...
Страница 63: ...Settings Concerning Maintenance SiE25 110 54 Field Setting FUYP...
Страница 64: ...SiE25 110 Settings Concerning Maintenance Field Setting 55 FHYP...
Страница 65: ...Settings Concerning Maintenance SiE25 110 56 Field Setting FAYP...
Страница 67: ...Settings Concerning Maintenance SiE25 110 58 Field Setting RZP100 125DV1 E RZP100DVAL E...
Страница 68: ...SiE25 110 Settings Concerning Maintenance Field Setting 59 RZP125 140DTAL...
Страница 107: ...Operation Range SiE25 110 98 Function and Operation 5 Operation Range 5 1 Operation Limits...
Страница 133: ...Procedure of Self Diagnosis by Remote Controller SiE25 110 124 Troubleshooting...
Страница 238: ...SiE25 110 Piping Diagrams Appendix 229 1 2 Twin System RZP100D RZP125D 3D034162...
Страница 240: ...SiE25 110 Wiring Diagrams Appendix 231 FHYP45BV1 FHYP60BV1 FHYP71BV1 FHYP100BV1 FHYP125BV1 3D027503...
Страница 241: ...Wiring Diagrams SiE25 110 232 Appendix FUYP71BV1 FUYP100BV1 FUYP125BV1 3D027747...
Страница 242: ...SiE25 110 Wiring Diagrams Appendix 233 FAYP71BV1 FAYP100BV1 3D027748...
Страница 243: ...Wiring Diagrams SiE25 110 234 Appendix 2 2 Outdoor Units 2 2 1 50Hz RZP71DV1 3D032604...
Страница 244: ...SiE25 110 Wiring Diagrams Appendix 235 RZP100DV1 RZP125DV1 3D032603...
Страница 245: ...Wiring Diagrams SiE25 110 236 Appendix 2 2 2 60Hz RZP71DVAL 3D032880B...
Страница 246: ...SiE25 110 Wiring Diagrams Appendix 237 RZP100DVAL 3D032881B...
Страница 247: ...Wiring Diagrams SiE25 110 238 Appendix RZP125DTAL RZP140DTAL 3D032882B...
Страница 251: ...SiE25 110 iv Index...