Troubleshooting by Remote Controller Display / LED Display
SiE25-110
166
Troubleshooting
Troubleshooting
YES
NO
Replace the compressor.
NO
Replace the inverter PC board.
Compressor inspection
Inspect according to the diagnosis
procedure for abnormal noise,
vibration, operating status, etc.
of the compressor.
Correct the power supply.
YES
YES
NO
0
Approximate value
RZP71DV1
RZP71DVAL
RZP100 ~ 140DV1
RZP100DVAL
RZP125DTAL
RZP140DTAL
Instantaneous overcurrent
detection value
20A
65A
65A
Is
instantaneous voltage
drop generated?
Is
the compressor
coil disconnected or
is the insulation
defective?
NO
YES
Open the stop valve.
Is the stop valve open?
Turn the main power supply
off, and then disconnect the
connection between the
compressor and inverter.
Check the installation
conditions.
Check the power
supply voltage.
Continuity check in the
power transistor (IGBT)Is
the continuity
normal?
NO
Replace the inverter PC board.
YES
Is
the inverter
output voltage
generated
approximately at the
same increasing speed
for each phase after
turning on again?
(
*
) (U-V, V-W,
W-U)
*
When operating compressor
with compressor output line
disconnected, the compressor
stops due to malfunction after
elapsed time of 5 seconds.
Therefore, check the voltage
increase for 5 seconds.
Check No. 10
(S2592)
Caution
Be sure to turn off power switch before connect or disconnect connector,
or parts damage may be occurred.
Содержание SkyAir Super Inverter 70 D Series
Страница 11: ...SiE25 110 2...
Страница 15: ...Model Name and Power Supply SiE25 110 6 Model Name and Power Supply...
Страница 16: ...SiE25 110 Functions 7 Part 2 Functions 1 List of Functions 8 1 1 Functions 8...
Страница 31: ...Specifications SiE25 110 22 Specifications...
Страница 35: ...Wired Remote Controller SiE25 110 26 Remote Controller 1 2 Installation...
Страница 36: ...SiE25 110 Wired Remote Controller Remote Controller 27...
Страница 39: ...Wireless Remote Controller SiE25 110 30 Remote Controller...
Страница 63: ...Settings Concerning Maintenance SiE25 110 54 Field Setting FUYP...
Страница 64: ...SiE25 110 Settings Concerning Maintenance Field Setting 55 FHYP...
Страница 65: ...Settings Concerning Maintenance SiE25 110 56 Field Setting FAYP...
Страница 67: ...Settings Concerning Maintenance SiE25 110 58 Field Setting RZP100 125DV1 E RZP100DVAL E...
Страница 68: ...SiE25 110 Settings Concerning Maintenance Field Setting 59 RZP125 140DTAL...
Страница 107: ...Operation Range SiE25 110 98 Function and Operation 5 Operation Range 5 1 Operation Limits...
Страница 133: ...Procedure of Self Diagnosis by Remote Controller SiE25 110 124 Troubleshooting...
Страница 238: ...SiE25 110 Piping Diagrams Appendix 229 1 2 Twin System RZP100D RZP125D 3D034162...
Страница 240: ...SiE25 110 Wiring Diagrams Appendix 231 FHYP45BV1 FHYP60BV1 FHYP71BV1 FHYP100BV1 FHYP125BV1 3D027503...
Страница 241: ...Wiring Diagrams SiE25 110 232 Appendix FUYP71BV1 FUYP100BV1 FUYP125BV1 3D027747...
Страница 242: ...SiE25 110 Wiring Diagrams Appendix 233 FAYP71BV1 FAYP100BV1 3D027748...
Страница 243: ...Wiring Diagrams SiE25 110 234 Appendix 2 2 Outdoor Units 2 2 1 50Hz RZP71DV1 3D032604...
Страница 244: ...SiE25 110 Wiring Diagrams Appendix 235 RZP100DV1 RZP125DV1 3D032603...
Страница 245: ...Wiring Diagrams SiE25 110 236 Appendix 2 2 2 60Hz RZP71DVAL 3D032880B...
Страница 246: ...SiE25 110 Wiring Diagrams Appendix 237 RZP100DVAL 3D032881B...
Страница 247: ...Wiring Diagrams SiE25 110 238 Appendix RZP125DTAL RZP140DTAL 3D032882B...
Страница 251: ...SiE25 110 iv Index...