
Disassembly and Maintenance: Indoor Units
ESIE04-01
5–114
Part 5 – Disassembly and Maintenance
3
1
55
2.12.4 Removal of PC Board
Warning
Be sure to wait 10 minutes or more after turning off all power supplies before disassembling work.
Procedure:
Step
Procedure
Points
P
Remove the outer panels
according to the procedure
for "Removal of Electrical
Parts Box".
1
Disconnect the front side
wiring connector
connected to the PC
board.
2
Disconnect the PC board
from the tabs by pushing
it inward. Draw the PC
board out partly and
disconnect the remaining
connectors.
The tape holding the electrical
parts box and PC board is for
transport, and is unnecessary
when reinstalling.
3
Completely remove the
PC board.
RZQ - Final.book Page 114 Wednesday, September 8, 2004 8:40 AM
Содержание RZQ71~125B7V3B
Страница 1: ...Service Manual ESIE04 01 RZQ71 125B7V3B Sky Air Inverter R 410A B series ...
Страница 2: ......
Страница 24: ...ESIE04 01 1 2 Part 1 System Outline 3 1 1 5 ...
Страница 32: ...General Outline Outdoor Units ESIE04 01 1 10 Part 1 System Outline 3 1 1 4 5 ...
Страница 64: ...General Outline Indoor Units ESIE04 01 1 42 Part 1 System Outline 3 1 1 4 5 ...
Страница 76: ...Specifications ESIE04 01 1 54 Part 1 System Outline 3 1 1 4 5 ...
Страница 92: ...Functional Diagrams ESIE04 01 1 70 Part 1 System Outline 3 1 1 4 5 ...
Страница 94: ...ESIE04 01 1 72 Part 1 System Outline ...
Страница 122: ...Wiring Diagrams ESIE04 01 1 100 Part 1 System Outline 3 1 1 4 5 ...
Страница 140: ...ESIE04 01 2 2 Part 2 Functional Description 3 1 2 5 ...
Страница 162: ...General Functionality ESIE04 01 2 24 Part 2 Functional Description 3 1 2 4 5 ...
Страница 200: ...Outdoor Unit Functional Concept ESIE04 01 2 62 Part 2 Functional Description 3 1 2 4 5 ...
Страница 202: ...ESIE04 01 3 2 Part 3 Troubleshooting 3 1 3 5 ...
Страница 288: ...Error Codes Outdoor Units ESIE04 01 3 88 Part 3 Troubleshooting 3 1 3 4 5 ...
Страница 312: ...Additional Checks for Troubleshooting ESIE04 01 3 112 Part 3 Troubleshooting 3 1 3 4 5 ...
Страница 314: ...ESIE04 01 4 2 Part 4 Commissioning and Test Run 3 1 4 5 ...
Страница 356: ...ESIE04 01 5 2 Part 5 Disassembly and Maintenance 3 1 5 ...
Страница 370: ...Disassembly and Maintenance Outdoor Units ESIE04 01 5 16 Part 5 Disassembly and Maintenance 3 1 5 5 ...
Страница 476: ...Disassembly and Maintenance Indoor Units ESIE04 01 5 122 Part 5 Disassembly and Maintenance 3 1 5 5 ...
Страница 484: ...ESIE04 01 viii Index 3 1 4 5 ...