
ESIE04-01
Disassembly and Maintenance: Indoor Units
Part 5 – Disassembly and Maintenance
5–39
3
5
1
5
2.8.5
Removal of Swing Motor
Warning
Be sure to wait 10 minutes or more after turning off all power supplies before disassembling work.
Procedure:
Step
Procedure
Points
1
Removing the decoration
panel
P
Refer to the "Removal
of Decoration Panel"
2
Pull out the swing motor
harness from the wiring
groove.
3
Remove two mounting
screws for swing motor
mounting plate to remove
the plate.
4
Turn the horizontal vane
to downward manually,
and turn up the panel
side gear to disengage
the motor side gear.
5
Remove the swing
motor.
P
Precaution during swing
motor insttallation
Fixing screw
Wiring groove
(S2647)
(S2648)
RZQ - Final.book Page 39 Wednesday, September 8, 2004 8:40 AM
Содержание RZQ71~125B7V3B
Страница 1: ...Service Manual ESIE04 01 RZQ71 125B7V3B Sky Air Inverter R 410A B series ...
Страница 2: ......
Страница 24: ...ESIE04 01 1 2 Part 1 System Outline 3 1 1 5 ...
Страница 32: ...General Outline Outdoor Units ESIE04 01 1 10 Part 1 System Outline 3 1 1 4 5 ...
Страница 64: ...General Outline Indoor Units ESIE04 01 1 42 Part 1 System Outline 3 1 1 4 5 ...
Страница 76: ...Specifications ESIE04 01 1 54 Part 1 System Outline 3 1 1 4 5 ...
Страница 92: ...Functional Diagrams ESIE04 01 1 70 Part 1 System Outline 3 1 1 4 5 ...
Страница 94: ...ESIE04 01 1 72 Part 1 System Outline ...
Страница 122: ...Wiring Diagrams ESIE04 01 1 100 Part 1 System Outline 3 1 1 4 5 ...
Страница 140: ...ESIE04 01 2 2 Part 2 Functional Description 3 1 2 5 ...
Страница 162: ...General Functionality ESIE04 01 2 24 Part 2 Functional Description 3 1 2 4 5 ...
Страница 200: ...Outdoor Unit Functional Concept ESIE04 01 2 62 Part 2 Functional Description 3 1 2 4 5 ...
Страница 202: ...ESIE04 01 3 2 Part 3 Troubleshooting 3 1 3 5 ...
Страница 288: ...Error Codes Outdoor Units ESIE04 01 3 88 Part 3 Troubleshooting 3 1 3 4 5 ...
Страница 312: ...Additional Checks for Troubleshooting ESIE04 01 3 112 Part 3 Troubleshooting 3 1 3 4 5 ...
Страница 314: ...ESIE04 01 4 2 Part 4 Commissioning and Test Run 3 1 4 5 ...
Страница 356: ...ESIE04 01 5 2 Part 5 Disassembly and Maintenance 3 1 5 ...
Страница 370: ...Disassembly and Maintenance Outdoor Units ESIE04 01 5 16 Part 5 Disassembly and Maintenance 3 1 5 5 ...
Страница 476: ...Disassembly and Maintenance Indoor Units ESIE04 01 5 122 Part 5 Disassembly and Maintenance 3 1 5 5 ...
Страница 484: ...ESIE04 01 viii Index 3 1 4 5 ...