
General Functionality
ESIE04-01
2–18
Part 2 – Functional Description
3
1
2
4
5
1.14
Defrost Operation
Outline
When the unit is operating in heating mode, a defrost operation will be conducted in order to avoid ice
formation on the outdoor unit heat exchanger.
Defrost starting
conditions
Defrost will start when the following conditions have been realized:
Areas
Defrost upper limit A
P
Integrated compressor running time is 25 minutes or more since
the completion of the previous defrost operation.
&
OR
P
Defrost upper limit time A is met.
P
Low pressure saturated temperature (Te) is within the
defrost requesting area.
P
Outdoor unit heat exchanger area temperature (Tb) is
within the defrost requesting area.
Defrost prohibiting area
Defrost permitting area
Evaporating temperature Te (°C)
or
Outdoor unit heat exchanger temperature Tb (°C)
When slightly quick defrost
starting is set
Factory setting
When slightly slow defrost
starting is set
When slightly quick defrost
starting is set
Defrost requesting area
When slightly quick defrost
starting is set
Factory setting
Outdoor
Temp. TA °C
When quick defrost
starting is set
16(26)-3-03
Factory setting
16(26)-3-01
When slow defrost
starting is set
16(26)-3-02
Outdoor temperature
> -5°C
40 minutes
3 hours
6 hours
Outdoor temperature
≤
-5°C
40 minutes
6 hours
8 hours
RZQ - Final.book Page 18 Wednesday, September 8, 2004 8:40 AM
Содержание RZQ71~125B7V3B
Страница 1: ...Service Manual ESIE04 01 RZQ71 125B7V3B Sky Air Inverter R 410A B series ...
Страница 2: ......
Страница 24: ...ESIE04 01 1 2 Part 1 System Outline 3 1 1 5 ...
Страница 32: ...General Outline Outdoor Units ESIE04 01 1 10 Part 1 System Outline 3 1 1 4 5 ...
Страница 64: ...General Outline Indoor Units ESIE04 01 1 42 Part 1 System Outline 3 1 1 4 5 ...
Страница 76: ...Specifications ESIE04 01 1 54 Part 1 System Outline 3 1 1 4 5 ...
Страница 92: ...Functional Diagrams ESIE04 01 1 70 Part 1 System Outline 3 1 1 4 5 ...
Страница 94: ...ESIE04 01 1 72 Part 1 System Outline ...
Страница 122: ...Wiring Diagrams ESIE04 01 1 100 Part 1 System Outline 3 1 1 4 5 ...
Страница 140: ...ESIE04 01 2 2 Part 2 Functional Description 3 1 2 5 ...
Страница 162: ...General Functionality ESIE04 01 2 24 Part 2 Functional Description 3 1 2 4 5 ...
Страница 200: ...Outdoor Unit Functional Concept ESIE04 01 2 62 Part 2 Functional Description 3 1 2 4 5 ...
Страница 202: ...ESIE04 01 3 2 Part 3 Troubleshooting 3 1 3 5 ...
Страница 288: ...Error Codes Outdoor Units ESIE04 01 3 88 Part 3 Troubleshooting 3 1 3 4 5 ...
Страница 312: ...Additional Checks for Troubleshooting ESIE04 01 3 112 Part 3 Troubleshooting 3 1 3 4 5 ...
Страница 314: ...ESIE04 01 4 2 Part 4 Commissioning and Test Run 3 1 4 5 ...
Страница 356: ...ESIE04 01 5 2 Part 5 Disassembly and Maintenance 3 1 5 ...
Страница 370: ...Disassembly and Maintenance Outdoor Units ESIE04 01 5 16 Part 5 Disassembly and Maintenance 3 1 5 5 ...
Страница 476: ...Disassembly and Maintenance Indoor Units ESIE04 01 5 122 Part 5 Disassembly and Maintenance 3 1 5 5 ...
Страница 484: ...ESIE04 01 viii Index 3 1 4 5 ...