
ESIE04-01
Disassembly and Maintenance: Outdoor Units
Part 5 – Disassembly and Maintenance
5–11
3
5
1
5
1.2.5
Removal of PC Board Ass'y (2)
Warning
Be sure to wait 10 minutes or more after turning off all power supplies before disassembling work.
Procedure
Step
Procedure
Points
2
Remove the PC board (for
inverter use)
1
2
Disconnect all
connectors.
Unscrew the three
screws that fix the
mounting plate of
electrical components
(for control use).
Disengage the hooks in
two places to remove the
mounting plate of
electrical components
(for control use).
3
In order to remove the
PC board ass'y (for
inverter use), unscrew a
single screw.
Note:
The plastic casing and the PC board are bonded to
each other. Therefore, for the replacement of these
parts, replace by a set of the PC board ass'y.
Hooks
Plastic casing
PC board
Fixing screw
RZQ - Final.book Page 11 Wednesday, September 8, 2004 8:40 AM
Содержание RZQ71~125B7V3B
Страница 1: ...Service Manual ESIE04 01 RZQ71 125B7V3B Sky Air Inverter R 410A B series ...
Страница 2: ......
Страница 24: ...ESIE04 01 1 2 Part 1 System Outline 3 1 1 5 ...
Страница 32: ...General Outline Outdoor Units ESIE04 01 1 10 Part 1 System Outline 3 1 1 4 5 ...
Страница 64: ...General Outline Indoor Units ESIE04 01 1 42 Part 1 System Outline 3 1 1 4 5 ...
Страница 76: ...Specifications ESIE04 01 1 54 Part 1 System Outline 3 1 1 4 5 ...
Страница 92: ...Functional Diagrams ESIE04 01 1 70 Part 1 System Outline 3 1 1 4 5 ...
Страница 94: ...ESIE04 01 1 72 Part 1 System Outline ...
Страница 122: ...Wiring Diagrams ESIE04 01 1 100 Part 1 System Outline 3 1 1 4 5 ...
Страница 140: ...ESIE04 01 2 2 Part 2 Functional Description 3 1 2 5 ...
Страница 162: ...General Functionality ESIE04 01 2 24 Part 2 Functional Description 3 1 2 4 5 ...
Страница 200: ...Outdoor Unit Functional Concept ESIE04 01 2 62 Part 2 Functional Description 3 1 2 4 5 ...
Страница 202: ...ESIE04 01 3 2 Part 3 Troubleshooting 3 1 3 5 ...
Страница 288: ...Error Codes Outdoor Units ESIE04 01 3 88 Part 3 Troubleshooting 3 1 3 4 5 ...
Страница 312: ...Additional Checks for Troubleshooting ESIE04 01 3 112 Part 3 Troubleshooting 3 1 3 4 5 ...
Страница 314: ...ESIE04 01 4 2 Part 4 Commissioning and Test Run 3 1 4 5 ...
Страница 356: ...ESIE04 01 5 2 Part 5 Disassembly and Maintenance 3 1 5 ...
Страница 370: ...Disassembly and Maintenance Outdoor Units ESIE04 01 5 16 Part 5 Disassembly and Maintenance 3 1 5 5 ...
Страница 476: ...Disassembly and Maintenance Indoor Units ESIE04 01 5 122 Part 5 Disassembly and Maintenance 3 1 5 5 ...
Страница 484: ...ESIE04 01 viii Index 3 1 4 5 ...