4 Installation
Installation manual
7
EHYHBH05AAV3* + EHYHBH/X08AAV3*
Daikin Altherma hybrid heat pump – heat pump module
4P349587-1F – 2016.10
4.3
Connecting the refrigerant piping
See the outdoor unit installation manual for all guidelines,
specifications and installation instructions.
4.3.1
To connect the refrigerant piping to the
indoor unit
1
Connect the liquid stop valve from the outdoor unit to the
refrigerant liquid connection of the indoor unit.
b
a
a
Refrigerant liquid connection
b
Refrigerant gas connection
2
Connect the gas stop valve from the outdoor unit to the
refrigerant gas connection of the indoor unit.
4.4
Connecting the water piping
4.4.1
Connecting the water piping of the indoor
unit
To connect the water piping for space heating
NOTICE
In case of old heating installations, it is recommended to
use a dirt separator. Dirt or sediment from the heating
installation can damage the unit and reduce its lifetime.
NOTICE
Do NOT use excessive force when connecting the piping.
Deformation of the piping can cause malfunctioning of the
unit.
NOTICE
▪ It is recommended to install shut-off valves to space
heating in and space heating out connections. Shut-off
valves are field supplied. They allow service to the unit
without draining the whole system.
▪ Foresee a drain/fill point to drain or fill the space
heating circuit
NOTICE
Do NOT install valves to shut down the entire emitter
system (radiators, floor heating loops, fan coil units, ...)
instantly if this can result in an immediate short circuit of
the water flow between the outlet and the inlet of the unit
(for example via a bypass valve). This may trigger an error.
1
Connect the water inlet connection (Ø22 mm).
2
Connect the water outlet connection (Ø22 mm).
a
b
a
Water inlet
b
Water outlet
3
In case of connection with the optional domestic hot water tank,
see the installation manual of the domestic hot water tank.
NOTICE
Install air purge valves at all local high points.
4.4.2
To fill the space heating circuit
Before filling the space heating circuit, the gas boiler MUST be
installed.
1
Flush the installation thoroughly to clean the circuit.
2
Connect the water supply hose to the drain point (field supply).
3
Power up the gas boiler to see the pressure indication on the
boiler display.
4
Make sure that the air purge valves of the gas boiler and the
heat pump module are open (at least 2 turns).
5
Fill the circuit with water until the boiler display indicates a
pressure of ±2 bar (with a minimum of 0.5 bar).
6
Purge air from the water circuit as much as possible.