6 Commissioning

Installation manual

20

EHYHBH05AAV3* + EHYHBH/X08AAV3*

Daikin Altherma hybrid heat pump – heat pump module

4P349587-1F – 2016.10

6

Commissioning

NOTICE

NEVER  operate  the  unit  without  thermistors  and/or
pressure  sensors/switches.  Burning  of  the  compressor
might result.

6.1

Checklist before commissioning

Do NOT operate the system before the following checks are OK:

You  read  the  complete  installation  instructions,  as
described in the 

installer reference guide

.

The 

indoor unit

 is properly mounted.

The 

outdoor unit

 is properly mounted.

The 

gas boiler

 is properly mounted.

The following 

field wiring

 has been carried out according

to this document and the applicable legislation:

▪ Between the local supply panel and the outdoor unit

▪ Between indoor unit and outdoor unit

▪ Between the local supply panel and the indoor unit

▪ Between the indoor unit and the valves (if applicable)

▪ Between  the  indoor  unit  and  the  room  thermostat  (if

applicable)

▪ Between  the  indoor  unit  and  the  domestic  hot  water

tank (if applicable)

▪ Between  the  gas  boiler  and  the  local  supply  panel

(only applicable in case of hybrid system)

The 

communication  cable

  between  the  gas  boiler  and

the indoor unit is properly mounted.

The  system  is  properly 

earthed

  and  the  earth  terminals

are tightened.

The 

fuses

  or  locally  installed  protection  devices  are

installed  according  to  this  document,  and  have  not  been
bypassed.

The 

power  supply  voltage

  matches  the  voltage  on  the

identification label of the unit.

There  are  NO 

loose  connections

  or  damaged  electrical

components in the switch box.

There  are  NO 

damaged  components

  or 

squeezed

pipes

 on the inside of the indoor and outdoor units.

There are NO 

refrigerant leaks

.

The 

refrigerant  pipes

  (gas  and  liquid)  are  thermally

insulated.

The  correct  pipe  size  is  installed  and  the 

pipes

  are

properly insulated.

There is NO 

water leak

 inside the indoor unit.

There is NO 

water leak

 inside the gas boiler.

There  is  NO 

water  leak

  in  the  connection  between  the

gas boiler and the indoor unit.

The 

shut-off valves

 are properly installed and fully open

(field supply).

The 

stop valves

 (gas and liquid) on the outdoor unit are

fully open.

The 

air purge

 valve is open (at least 2 turns).

The 

pressure relief valve

 purges water when opened.

The 

gas boiler

 is switched ON.

Setting  . is correctly set on the gas boiler.

▪ 0=for EH EHYHBH08

▪ 1=for EHYHBX08

The 

minimum  water  volume

  is  guaranteed  in  all

conditions.  See  "To  check  the  water  volume"  in

"3.2 Preparing water piping" on page 4

.

INFORMATION

The  software  is  equipped  with  an  "installer-on-site"  mode
([4‑0E]),  that  disables  automatic  operation  by  the  unit.  At
first  installation,  setting  [4‑0E]  is  by  default  set  to  "1",
meaning  automatic  operation  is  disabled.  All  protective
functions  are  then  disabled.  If  the  user  interface  home
pages  are  off,  the  unit  will  NOT  operate  automatically.  To
enable  automatic  operation  and  the  protective  functions,
set [4‑0E] to "0".

12 hours after the first power-on, the unit will automatically
set  [4‑0E]  to  "0",  ending  "installer-on-site"  mode  and
enabling  the  protective  functions.  If  –  after  first
installation  –  the  installer  returns  to  the  site,  the  installer
has to set [4‑0E] to "1" manually.

6.2

Checklist during commissioning

The 

minimum  flow  rate

  is  guaranteed  in  all  conditions.

See  "To  check  the  water  volume  and  flow  rate"  in

"3.2 Preparing water piping" on page 4

.

To perform an 

air purge

.

To perform a 

test run

.

To perform an 

actuator test run

.

Underfloor screed dryout function

The  underfloor  screed  dryout  function  is  started  (if
necessary).

To perform an air purge on the 

gas supply

.

To perform a test run on the 

gas boiler

.

6.2.1

To check the minimum flow rate

1

Confirm  according  to  the  hydraulic  configuration  which  space
heating  loops  can  be  closed  due  to  mechanical,  electronic,  or
other valves.

2

Close all space heating loops that can be closed (see previous
step).

3

Start  the  pump  test  run  operation  (see 

"6.2.4  To  perform  an

actuator test run" on page 21

).

4

Go to [6.1.8]: 

 > Information > Sensor information > Flow rate

to check the flow rate. During pump test run operation, the unit
can operate below this minimum required flow rate.

Содержание EHYHBH05AA

Страница 1: ...Installation manual Daikin Altherma hybrid heat pump heat pump module English Installation manual Daikin Altherma hybrid heat pump heat pump module EHYHBH05AA EHYHBH08AA EHYHBX08AA ...

Страница 2: ...jsou využívány v souladu s našimi pokyny odpovídají následujícím normám nebo normativním dokumentům u skladu sa slijedećim standardom ima ili drugim normativnim dokumentom ima uz uvjet da se oni koriste u skladu s našim uputama 16 17 18 19 20 21 22 23 24 25 megfelelnek az alábbi szabvány ok nak vagy egyéb irányadó dokumentum ok nak ha azokat előírás szerint használják spełniają wymogi następującyc...

Страница 3: ...1 Indoor unit 12 5 1 1 Overview Configuration 12 5 1 2 Basic configuration 15 5 1 3 Menu structure Overview installer settings 19 6 Commissioning 20 6 1 Checklist before commissioning 20 6 2 Checklist during commissioning 20 6 2 1 To check the minimum flow rate 20 6 2 2 To perform an air purge 21 6 2 3 To perform a test run 21 6 2 4 To perform an actuator test run 21 6 2 5 To perform an underfloor...

Страница 4: ...e located in the upper part of the box The connection pieces for the gas boiler are attached to the water piping 1 Remove the accessories as described in 2 1 1 To unpack the indoor unit on page 4 a b c d e f g a General safety precautions b Addendum book for optional equipment c Indoor unit installation manual d Operation manual e Quick installation guide f Connection pieces for gas boiler g Boile...

Страница 5: ...3 Preparing electrical wiring 3 3 1 Overview of electrical connections for external and internal actuators Item Description Wires Maximum running current Outdoor unit and indoor unit power supply 1 Power supply for outdoor unit 2 GND a 2 Power supply and interconnection cable to indoor unit 3 GND g 3 Power supply gas boiler 2 GND c Item Description Wires Maximum running current 4 Preferential kWh ...

Страница 6: ... and lower screw on the side panel of the switch box 7 Remove the switch box from the unit 8 Hook the switch box to the side of the unit with the hooks foreseen on the switch box 6 6 7 8 4 2 Mounting the indoor unit 4 2 1 To install the indoor unit 1 Put the installation pattern see box on the wall and follow the steps as shown below 2 1 3 2 Fix the wall bracket to the wall with 2 M8 bolts 2 3 Lif...

Страница 7: ...s Shut off valves are field supplied They allow service to the unit without draining the whole system Foresee a drain fill point to drain or fill the space heating circuit NOTICE Do NOT install valves to shut down the entire emitter system radiators floor heating loops fan coil units instantly if this can result in an immediate short circuit of the water flow between the outlet and the inlet of th...

Страница 8: ...f the insulation materials should be at least 20 mm to prevent condensation on the surface of the insulation When the drain pan is installed make sure to insulate the water piping up to the drain pan to avoid condensation In case of EHYHBX 0 0 mm a a Drain pan kit 4 5 Connecting the electrical wiring DANGER RISK OF ELECTROCUTION WARNING ALWAYS use multicore cable for power supply cables 4 5 1 To c...

Страница 9: ...3 1 2 3 a Legend see illustration below In case of preferential kWh rate power supply 30 31 S1S X2M X1M 1 3 4 2 3 X5M L N L N c 1 2 3 1 2 3 b a a Interconnection cable main power supply b Normal kWh rate power supply c Preferential power supply contact 2 Fix the cable with cable ties to the cable tie mountings INFORMATION If the system is connected to a preferential kWh rate power supply a separat...

Страница 10: ...rdered separately mandatory option 4A From the rear b a PCB 1 4B From the left a PCB b 1 4C From the top a b PCB b 1 4D From the top centre a PCB b b 1 a Notch this part for the wiring to pass through with nippers etc b Secure the wiring to the front part of the casing using the wiring retainer and clamp 4 5 4 To connect the shut off valve 1 Connect the valve control cable to the appropriate termi...

Страница 11: ...llustration below 35 34 X2M X1M X5M 1 M M2P 2 Fix the cable with cable ties to the cable tie mountings 4 5 8 To connect the alarm output 1 Connect the alarm output cable to the appropriate terminals as shown in the illustration below 28 Y1 X2M X1M A4P A8P X5M a a Installation of EKRP1HB is required 2 Fix the cable with cable ties to the cable tie mountings 4 5 9 To connect the space cooling heatin...

Страница 12: ... 5 Configuration 5 1 Indoor unit 5 1 1 Overview Configuration This chapter describes what you have to do and know to configure the system after it is installed NOTICE The explanation about the configuration in this chapter gives you ONLY basic explanations For more detailed explanation and background information see the installer reference guide Why If you do NOT configure the system correctly it ...

Страница 13: ...ser permission level to End user 1 Press for more than 4 seconds Result The user permission level switches to End user The user interface will return to the default home screen To modify an overview setting Example Modify 1 01 from 15 to 20 1 Go to A 8 Installer settings Overview settings 2 Go to the corresponding screen of the first part of the setting by using the and button INFORMATION An addit...

Страница 14: ...utes It is recommended to change installer settings or the configuration of the unit on the main user interface If not it can take up to 5 minutes before these changes are visible in the menu structure 8 Your system is now set to be operated by the 2 user interfaces To copy the language set from the first to the second user interface See To copy the system settings from the first to the second use...

Страница 15: ...e A 2 2 2 E 06 Domestic hot water production 0 Type 1 by boiler 1 Type 2 by tank Note For Switzerland setting MUST be 1 A 2 2 3 E 07 Domestic hot water tank 4 Type 5 EKHWP 6 Type 7 Third party tank Range 0 6 Code Description A 2 2 A D 02 Domestic hot water pump not applicable for Switzerland In case of E 06 0 0 No default NOT installed 1 Secondary rtrn Installed for instant hot water In case of E ...

Страница 16: ...tional demand PCB is installed 0 No 1 Pwr consmp ctrl Energy metering Code Description A 2 2 8 D 08 Optional external kWh meter 1 0 No NOT installed 1 Installed 0 1 pulse kWh 2 Installed 1 pulse kWh 3 Installed 10 pulse kWh 4 Installed 100 pulse kWh 5 Installed 1000 pulse kWh A 2 2 C D 0A Optional gas meter 0 No NOT installed 1 Installed 1 pulse m 2 Installed 10 pulse m 3 Installed 100 pulse m Sav...

Страница 17: ...r temperature main Ta Outdoor temperature INFORMATION In order to optimise comfort as well as running costs it is recommended to choose weather dependent setpoint operation Set the settings carefully they have significant influence on heat pump as well as boiler operation Too high leaving water temperature can result in constant boiler operation Leaving water temperature Additional zone Code Descr...

Страница 18: ...1 7 9 0B Emitter type Reaction time of the system 0 Quick Example Small water volume and fan coils 1 Slow Example Large water volume floor heating loops Depending on the system water volume and the heat emitters type the heat up or cool down of a space can take longer This setting can compensate for a slow or a quick heating cooling system by adjusting the unit capacity during the heat up cool dow...

Страница 19: ...t type Compressor type Indoor software type Forced off contact Unit control method Number of LWT zones Pump operation mode Power saving possible User interface location Options DHW operation DHW tank DHW tank type Contact type add Digital I O PCB Demand PCB External kWh meter DHW pump External sensor Leaving water Main Additional Room thermostat Room temp range Room temp offset Ext room sensor off...

Страница 20: ... connection between the gas boiler and the indoor unit The shut off valves are properly installed and fully open field supply The stop valves gas and liquid on the outdoor unit are fully open The air purge valve is open at least 2 turns The pressure relief valve purges water when opened The gas boiler is switched ON Setting is correctly set on the gas boiler 0 for EHYHBH05 EHYHBH08 1 for EHYHBX08 ...

Страница 21: ...e leaving water temperature control and the domestic hot water control are turned OFF via the user interface 3 Go to A 7 4 Installer settings Commissioning Actuator test run 4 Select an actuator and press Example Pump 5 Select OK and press Result The actuator test run starts It automatically stops when finished To stop it manually press select OK and press Possible actuator test runs Pump test INF...

Страница 22: ...find the complete documentation on the url as earlier described in this manual Explain the user how to properly operate the system and what to do in case of problems Show the user what to do in relation to maintaining the unit Explain the user about energy saving tips as described in the operation manual 8 Technical data A subset of the latest technical data is available on the regional Daikin web...

Страница 23: ...ain leaving water temperature On OFF thermostat wired On OFF thermostat wired On OFF thermostat wireless On OFF thermostat wireless Ext thermistor External thermistor Heat pump convector Heat pump convector Add LWT Additional leaving water temperature On OFF thermostat wired On OFF thermostat wired On OFF thermostat wireless On OFF thermostat wireless Ext thermistor External thermistor Heat pump c...

Страница 24: ...s Continuous current DHW pump output Domestic hot water pump output DHW pump Domestic hot water pump Electrical and gas meter Electrical and gas meter English Translation Ext thermistor option External thermistor option For safety thermostat For safety thermostat Inrush Inrush current Max load Maximum load Normally closed Normally closed Normally open Normally open Safety thermostat contact 16 V D...

Страница 25: ... add X2M 1a 2a 4 main X2M 1 2 4 Only for KRP1AHTA communication 2 core communication 2 core Power limitation demand input 4 Power limitation demand input 3 Power limitation demand input 2 Power limitation demand input 1 X2 2 4 earth unit power supply 230 V earth Gas boiler 3 core Gas boiler part Heat pump part 4 core In case user interface is relocated In case of signal cable keep minimum distance...

Страница 26: ......

Страница 27: ......

Страница 28: ...4P349587 1F 2016 10 Copyright 2013 Daikin ...

Отзывы: