Operating Test
Si18-201
206
Operating Test
1. Operating Test
1.1
Operating Test
1
OPERATING TEST
*Check the connection status.
Be sure to carry out initial settings.
Check Flow
Before performing a trial operation
Approximately one minute later, the LEDs 2 - 4 on the
service monitor P-panel flash to indicate the number of
indoor units connected to each BP unit.
Turn OFF the power, correct the wiring, and then turn
ON the power again.
The procedure from step will be taken automatically.
Indoor units are connected to the BP
unit, but the display shows “ - ”:
The transmission failure occurred
between indoor units and BP unit.
Check the wiring.
The number of outdoor units is not
correct.
The transmission failure occurred
between BP unit and indoor units.
Check the wiring.
Check the LED of the appropriate
BP unit.
Check that the number of indoor units installed and
the indication on the P-panel are the same.
Press the SET SW on the service monitor P-panel.
(The flashing becomes lighting indication.)
Now the trial operation is possible.
If the SET SW was pressed even though the number of
indoor units installed and the indication on the P-panel
are not the same, perform the following operation to
cancel the setting.
Reset the power supply.
Approximately one minute after the “888” is displayed
on the LEDs 2 - 4, the number of indoor units
connected to each BP unit will be displayed instead.
(Lighting time: approx. 30 sec)
Then press the SET SW.
The procedure from step will be taken
automatically.
Checking the number of BP unit
and indoor units connected *ex)
OK
NG
2
3
4
5
1
1
1
When the power is first turned on, the LEDs 2 - 4 on the
service monitor P-panel light up to indicate “888”.
Содержание BPMK928B42
Страница 9: ...Si18 201 viii Table of Contents ...
Страница 71: ...Specifications Si18 201 58 Specifications ...
Страница 206: ...Si18 201 Remote Controller Operations 193 1 1 2 FVX25 35KZ ...
Страница 207: ...Remote Controller Si18 201 194 Operations 1 1 3 FTXD25 35KZ ...
Страница 208: ...Si18 201 Remote Controller Operations 195 1 1 4 FTK FTX50 60H ...
Страница 209: ...Remote Controller Si18 201 196 Operations 1 1 5 FTKD FTXD50 60 71J ...
Страница 213: ...Remote Controller Si18 201 200 Operations 1 1 9 FHYC35 50 60 71K Optional Accessory BRC7C612WC ...
Страница 214: ...Si18 201 Remote Controller Operations 201 ...
Страница 216: ...Si18 201 Remote Controller Operations 203 ...
Страница 217: ...Remote Controller Si18 201 204 Operations ...
Страница 234: ...Si18 201 Method of Field Set Operating Test 221 2 3 Interface Adaptor for Room Airconditioner KRP928A1S ...
Страница 237: ...Method of Field Set Si18 201 224 Operating Test ...
Страница 262: ...Si18 201 Troubleshooting SkyAir Indoor Unit Service Diagnosis 249 ...
Страница 393: ...Wiring Diagrams Si18 201 380 Appendix FHYC35 50 60 71KVE9 3D005668C ...
Страница 394: ...Si18 201 Wiring Diagrams Appendix 381 FHYC35 50 60 71KV1C9 ...
Страница 395: ...Wiring Diagrams Si18 201 382 Appendix FDYM60 03FAV1 FDYM60 03FAVAL C 3D019816D OPTION ...
Страница 396: ...Si18 201 Wiring Diagrams Appendix 383 FDYM60 03FAV1C ...