OMM 1166-1
AGZ 025D through 190D
57
Screen Cx-2
From Screen U-9
Circuit x Status/Settings
No password
Operator
Links to screen
Evap Leaving Water Temp
Evap Entering Water Temp
Evap Approach
*
Evap Approach @ Design
*
Evaporator Pressure
*
Evaporator Saturated Temperature
*
Condenser Pressure
*
Condenser Saturated Temperature
*
Suction Temperature
*
Suction Superheat
*
Compressor 1/2
Run Hours
*
Number Of Starts
*
Last Compressor Start
*
Last Compressor Stop
*
Compressor 3/4
Run Hours
*
Number Of Starts
*
Last Compressor Start
*
Last Compressor Stop
*
Compressor 5/6
Run Hours
*
Number Of Starts
*
Last Compressor Start
*
Last Compressor Stop
*
Condenser
Number of Fans Running
*
Stage Up Error
*
Stage Down Error
*
Condenser Target
*
VFD Target
*
VFD Speed
*
EXV
EXV State
*
EXV Position
*
Superheat Target
*
Suction Superheat
*
EXV Control Mode
*
Screen Cx-3
From Screen U-10, U-11
Circuit x Manual Control
No password
Operator
Links to screen
Test Comp 1/2 Output
Test Comp 3/4 Output
Test Comp 5/6 Output
Test Liquid Line Output
Test Hot Gas Output
Test EXV Position
Test Fan Output 1
Continued next page.
Содержание AGZ 190D
Страница 12: ...12 AGZ 025D through 190D OMM 1166 1 Figure 2 Typical Field Control Wiring...
Страница 81: ......
Страница 82: ......
Страница 83: ......