31
11.
OPERATION
Described in this item are steps from the first power ON, initial setting, and full load setting to the actual
operation.
For the other operation functions and details, refer to the "MD-SX OPERATION MANUAL" (Q7LT333380F).
11.1
Checks before turning the power on
Always check the followings before turning the power on for the first time.
If the system is correctly wired according to the specification
If the sensors and controller are correctly installed
If the required 24 V DC power is properly supplied
If the sensors are correctly set for node and termination
11.2
Steps from the first power ON to practical operation
Shown below is the flow diagram for settings to be made from the power ON to the actual operation
[FULL LOAD SET]
Initial setting (2)
[INITIAL SET]
Initial setting (1)
Skip in the 2
nd
start-up and after.
Resetting on
the [MODE] menu
if necessary
Setting for the number of
engines
Setting for the number of
sensors
Average value computing
Setting for exclusion
Pre-full-load setting
Trial operating condition
Controller self-diagnosis
Sensor check
Power ON
Full load setting
Full load setting completed
Practical operation status
Fig. 36 The flow of steps when starting
Original content from www.daihatsu.cc
Issued to HORIZON TANKERS LIMITED S.A.