Important to remember!
Especially check the following points at delivery and installation:
◗
The CTC EcoZenith
I
550 should be transported and stored in a standing position.
When being entered, the product can be laid on its back temporarily.
◗
Remove the packaging. Before installation, check that the product has not been
damaged during transport. Notify the forwarding agent of any transport damage.
◗
Place the CTC EcoZenith
I
550 on a solid surface, preferably a concrete foundation.
If it is to stand on a soft carpet, plates must be placed under the feet.
◗
Remember to leave a service space of at least 1 m in front of the product. Space is also
needed around the product for installation of insulation and plastic roof. Please refer
to the section Transport, unpacking and installation, in the part for the installation
engineer. The CTC EcoZenith
I
550 should not be lowered below floor level.
Safety Instructions
The following safety instructions should be followed when handling, installing and using
the CTC EcoZenith
I
550:
◗
Close the safety switch before doing any work on the product.
◗
The CTC EcoZenith
I
550 must not be flushed with water.
◗
When handling the product with a lifting eye bolt or similar, ensure the lifting
equipment, eye bolts and other parts are not damaged. Never stand under
a hoisted product.
◗
Never jeopardize safety by removing bolted covers, hoods or similar.
◗
Never jeopardize safety by deactivating safety equipment.
◗
Any work on the product should be done by authorised personnel only.
◗
Safety valve check: the safety valve for the boiler/system and warm tap water should
be checked regularly. Refer to the Operation and Maintenance section.