PN 12069 R072208
46
OPERATION
5.2 iniTial adJuSTmenTS
Since all applications of the Air Reel are not the same, based on
header and combine variations, some initial adjustments must
be made to achieve peak performance of your Air Reel.
5.2.1 Reel adJuSTmenT
Place header on a level surface.
1.
Pull reel back as close as possible to auger while maintain-
2.
ing clearance between auger flighting and bat tubes. Install
reel aft stop.
Adjust reel tines perpendicular to sickle sections.
3.
do noT oPeRaTe WiTh Reel TineS conTacTinG
The GRound.
noTe
Place all controls in neutral or off, stop combine engine, set
parking brake, remove ignition key, wait for all moving parts
to stop, then properly block machine before servicing, ad-
justing, repairing, or unplugging.
WaRninG
Figure 44, Initial reel adjustment
Adjust reel height to achieve a 1” minimum clearance be-
4.
tween the reel tines and sickle at maximum sickle flex height.
Set cylinder stops at this position.
Move reel ahead until fingers are a minimum of 1” from the
5.
ground. Install a stop on the reel arm to prevent forward
travel from this point.
Loosen pivot clamp and adjust so the actuator is in middle
6.
of stroke (approx. 2” of actuator shaft exposed) with air tube
nozzles pointed at the back of the sickle bar (Figure 44).
Retighten pivot clamp.
Turn adjustable air tubes at each end of the header so they
7.
direct air into the corners of the header.
Содержание Air Reel 1010
Страница 17: ...PN 12069 R072208 13 ASSEMBLY 4 3 gearbox fan mount PRE 1993 SERIES Figure 5 Gearbox fan mount pre 1993 series...
Страница 25: ...PN 12069 R072208 21 ASSEMBLY 4 7 right hand drive kit PRE 1993 series Figure 12 RH drive kit Pre 1993 series...
Страница 39: ...PN 12069 R072208 35 ASSEMBLY 4 17 reel support manual FORE AFT Figure 33 Reel support manual right hand...
Страница 69: ......
Страница 70: ......
Страница 71: ......