PN 12069 R072208
10
Section
aSSemblY
4
4.1 uncRaTinG
Read all instructions to become familiar with the parts and procedure used before starting the actual work. You may refer to the parts
catalog for additional aid in assembling the Air Reel.
Locate the manifold and bats crate.
1.
Cut the metal bands and remove the 2” X 4”s and saddle
2.
tops (Figure 1).
Remove the bat assemblies from the crate and place to
3.
the side.
Remove the lag screws from the mounting clamps (as shown
4.
in Figure 2) from all locations.
Using an overhead hoist and a nylon strap, sling or chain,
5.
connect to the center of the manifold (Figure 3).
Remove from crate, and set down on two steel sawhorses
6.
(or equivalent) two to four inches from the ends of the
manifold.
The sawhorses must be capable of supporting 600
A.
pounds each.
The sawhorses must be at least 3 feet high.
B.
Figure 1, Manifold and bats crate
Figure 2, Manifold and bats crate
Figure 3, Manifold and bats crate
The sawhorses must be capable of supporting 600
1.
pounds each.
The sawhorses must be at least 3 feet high.
2.
The sawhorses must be blocked, to keep the manifold
3.
from rolling.
WaRninG
Your reel may have a slight bow. This is normal and will work
itself out during normal operation.
noTe
Assemble in an area with sufficient space to handle
1.
the largest component and access to all sides of the
machine
Use only lifts, cranes and tools with sufficient capacity
2.
for the load.
When necessary, have someone assist you.
3.
Do not allow spectators in the working area.
4.
WaRninG
Содержание Air Reel 1010
Страница 17: ...PN 12069 R072208 13 ASSEMBLY 4 3 gearbox fan mount PRE 1993 SERIES Figure 5 Gearbox fan mount pre 1993 series...
Страница 25: ...PN 12069 R072208 21 ASSEMBLY 4 7 right hand drive kit PRE 1993 series Figure 12 RH drive kit Pre 1993 series...
Страница 39: ...PN 12069 R072208 35 ASSEMBLY 4 17 reel support manual FORE AFT Figure 33 Reel support manual right hand...
Страница 69: ......
Страница 70: ......
Страница 71: ......