34
RESERVED TO THE INSTALLER
LIFT ADJUSTMENT AND TESTING PROCEDURE
(should be carried out in each detail by the installer)
• CARRIAGE MECHANICAL ALIGNMENT
1) Press the UP push-button and check that the motor is running in the correct direction (carriages should rise); swap two phases in the terminal board
if needed.
2) Raise the carriages up to approx. 50 cm and measure height. If they are not at the same height, adjust as follows:
a) remove the retainer panel (6, Fig. 16) from carriage P1 and loosen the safety rope clamp on carriage P2 (5, Fig. 13);
b)raise the lift using suitable equipment until lifting the split nuts out of their seats so that they can be turned;
c) turn the split nuts right or left depending on whether you need to raise or lower P1 carriage with respect to P2 carriage (one turn of the split nuts dis-
places carriage by 6 mm);
d) bring the carriage back to the correct position over the nut screws with the split nuts positioned as shown in Figure 19.
• TESTING OF LOADED LIFT OPERATIONS
• CHECKING SAFETY DEVICE AND LIMIT SWITCH (SQ1, Fig. 1) AS DESCRIBED IN PARAGRAPH 6.1.3
• FUNCTIONAL TEST OF MAXIMUM HEIGHT LIMIT SWITCH (SQ2, Fig. 1) AS DESCRIBED IN PARAGRAPH 6.1.4
• FUNCTIONAL TEST OF MINIMUM HEIGHT LIMIT SWITCH (SQ3, Fig. 1) AS DESCRIBED IN PARAGRAPH 6.1.4
• MOVING PARTS LUBRICATION CHECK
Содержание ERCO 3222N CEL
Страница 2: ......
Страница 8: ...8 1 2 DIMENSIONI INGOMBRO 2585 85 130 6 0 0 9 4 0 1250 850 1870 1915 2570 3230 2480...
Страница 11: ...11 1 5 SCHEMA APPLICAZIONE PITTOGRAMMI Fig 6 BLOCCAGGIO PERMANENTE BRACCI Fig 6A 4 9 P1 8 3 6 1 2 P2 5 7 9...
Страница 12: ...12 POSIZIONE OPERATORE 1 6 ZONE A RISCHIO Fig 7 700 700 5000...
Страница 16: ...16 Fig 16 5 6 7 2 4 3...
Страница 31: ...31 9 0 SCHEMA ELETTRICO...
Страница 32: ...32...
Страница 33: ...33 FU1 FU3 KM1 KM2 KM3 KM4 FU2 TC1 CB2C NT...
Страница 36: ......
Страница 42: ...8 1 2 OVERALL DIMENSIONS 2585 85 130 6 0 0 9 4 0 1250 850 1870 1915 2570 3230 2480...
Страница 45: ...11 4 9 P1 8 3 6 1 2 P2 5 7 9 1 5 PICTOGRAMS APPLICATION DIAGRAM Fig 6 PERMANENTLY IMMOBILISING THE ARMS Fig 6A...
Страница 46: ...12 700 700 5000 POSITION OPERATOR 1 6 HAZARDOUS AREAS Fig 7...
Страница 50: ...16 Fig 16 5 6 7 2 4 3...
Страница 65: ...31 9 0 ELECTRONIC CIRCUIT BOARD DIAGRAM...
Страница 66: ...32...
Страница 67: ...33 FU1 FU3 KM1 KM2 KM3 KM4 FU2 TC1 CB2C NT...
Страница 70: ......
Страница 76: ...8 1 2 DIMENSIONS D ENCOMBREMENT 2585 85 130 6 0 0 9 4 0 1250 850 1870 1915 2570 3230 2480...
Страница 79: ...11 4 9 P1 8 3 6 1 2 P2 5 7 9 1 5 EMPLACEMENT DES PICTOGRAMMES Fig 6 BLOCAGE PERMANENT DES BRAS Fig 6A...
Страница 80: ...12 700 700 5000 POSITION OPERATEUR 1 6 ZONES A RISQUE Fig 7...
Страница 84: ...16 Fig 16 5 6 7 2 4 3...
Страница 99: ...31 9 1 SCHEMA CARTE ELECTRONIQUE...
Страница 100: ...32...
Страница 101: ...33 FU1 FU3 KM1 KM2 KM3 KM4 FU2 TC1 CB2C NT...
Страница 104: ......
Страница 110: ...8 1 2 ABMESSUNGEN 2585 85 130 6 0 0 9 4 0 1250 850 1870 1915 2570 3230 2480...
Страница 113: ...11 4 9 P1 8 3 6 1 2 P2 5 7 9 1 5 APPLIKATIONSSCHEMA F R PIKTOGRAMME Abb 6 DAUERHAFTE SPERRE DER ARME Abb 6A...
Страница 114: ...12 700 700 5000 POSITION BEDIENER 1 6 GEFAHRENBEREICHE Abb 7...
Страница 118: ...16 Abb 16 5 6 7 2 4 3...
Страница 133: ...31 9 1 SCHEMA DER PLATINE...
Страница 134: ...32...
Страница 135: ...33 FU1 FU3 KM1 KM2 KM3 KM4 FU2 TC1 CB2C NT...
Страница 138: ......
Страница 144: ...8 1 2 DIMENSIONES TOTALES 2585 85 130 6 0 0 9 4 0 1250 850 1870 1915 2570 3230 2480...
Страница 147: ...11 4 9 P1 8 3 6 1 2 P2 5 7 9 1 5 ESQUEMA DE APLICACI N DE LOS PICTOGRAMAS Fig 6 BLOQUEO PERMANENTE BRAZOS Fig 6A...
Страница 148: ...12 700 700 5000 POSICI N OPERADOR 1 6 ZONAS EN RIESGO Fig 7...
Страница 152: ...16 5 6 7 2 4 3 Fig 16...
Страница 167: ...31 9 1 ESQUEMA TARJETA ELECTR NICA...
Страница 168: ...32...
Страница 169: ...33 FU1 FU3 KM1 KM2 KM3 KM4 FU2 TC1 CB2C NT...
Страница 172: ......
Страница 173: ......