Cooper Crouse-Hinds LP1 Series Скачать руководство пользователя страница 5

MAINTENANCE

1.

Frequent inspection should be made.

A schedule for

maintenance checks should be determined by the environment
and frequency of use. It is recommended that it should be at
least once a year.

2. Perform visual, electrical, and mechanical checks on all

components on a regular basis.

• Visually check for undue heating evidenced by discoloration of
wires or other components, damaged or worn parts, or leakage
evidenced by water or corrosion in the interior.

• Electrically check to make sure that all connections are clean
and tight.

• Mechanically check that all parts are properly assembled, and
operating mechanisms move freely.

• When checking torque on main lugs, it may be necessary to
move the insulating barrier to get access to the screws on the
main lugs.

3. A desiccant packet has been included in this enclosure at the

factory. The purpose of the desiccant is to absorb and remove
water on contact or from the atmosphere, and protect the
enclosed equipment from damage. The desiccant packet will
expand 3 to 4 times its original size. Desiccant should be
checked and replaced at regular equipment service intervals or
every 3 to 6 months. Remove the desiccant packets from their
packaging and install in each enclosure.

This desiccant is non-toxic, emits no fumes, and generates no heat
during use. No gloves, masks or special clothing are required to
handle this packet.

4. Make sure all cover bolts are fully retracted into cover
before closing cover on body. Align main circuit breaker
operator with toggle position of the main circuit breaker. Close
cover and start cover bolt threads by hand. Torque all cover bolts
securely to 25-30 ft. lbs.

Replacement parts are available through your Crouse-Hinds
distributor. Replace circuit breakers only with Cutler-Hammer
breakers as follows:

CIRCUIT BREAKER

240/120 - 120/208 VAC

Max. Amps

Breaker Type

Back Feed Main

100

BAB

Branch

35

GFI or EPD

30

QBHGF/QBHGFEP

5. We recommend an Electrical Preventive Maintenance program

as described in the National Fire Protection Association Bulletin
NFPA No. 70B.

ADDING OR REMOVING BREAKERS

Breaker actuator kits are used to change the configuration of an
existing panel board. LP-K1 provides breaker operators for single
pole breakers and LP-K3 provides breaker operators for all GFI/EPD
breakers and 2 & 3 pole breakers, while LP-K2 provides operator
plugs. Changing present breaker pole combinations is solved by
choosing the appropriate kit.

Before adding or removing any breakers, see “OPENING COVER”
section. If adding breakers, determine the quantity, trip rating and
number of poles for each. Add or remove circuit breakers as
necessary.

For Group B applications, use only Cutler-Hammer QBHW series for
conventional breakers. GFI/EPD breakers are described in
“GROUND FAULT CIRCUIT BREAKER TESTING PROCEDURE”.

When adding a GFI/EPD breaker, remove appropriate plug (catalog
number LP-K5) on cover for push-to-test function. Note that this
entry is staggered by one position from the breaker operator handle.
Install plunger (LP-K4) to activate the push-to-test button on the
GFI/EPD breaker. Wire per Figure 2. Also, see note in “GROUND
FAULT CIRCUIT BREAKER TESTING PROCEDURE”.

Terminate any necessary additional wires to the newly added circuit
breakers by making sure that they are long enough to make the
required connections. Make connections per Figure 2 of either
single or three phase circuits, spare wires are provided.

Four spare wires are included for replacement wires. These wires
could be used for 50 Amp branch circuits by doubling the wires in
parallel.

Test wiring for correctness with continuity checks for unwanted
grounds with an insulation resistance tester.

With breakers installed in new panel board configuration, determine
the location and orientation of breaker operators to be added and
circuit positions to be plugged.

To install necessary breaker operators or plugs to the cover of the
breaker housing, see “

ADDING BREAKER OPERATORS

” or

ADDING PLUGS

.” Close cover per instructions in “

ADDING PLUG

section.

IF 1433 • 04/03

Copyright © 2003, Cooper Industries, Inc.

Page 5

CAUTION

Clean both ground joint surfaces of body and cover before

closing.Dirt or foreign material must not accumulate on flat ground

joint surfaces. Surfaces must seat fully against each other to

provide a proper explosionproof seal.

CONNECTOR WIRE TORQUE

LOCATION

WIRE

TORQUE

SIZE

(lb. in.)

TERMINAL STRIP

22-8 AWG

8

10-1/0 AWG

25

18-10 AWG

35

GROUND-NEUTRAL

8 AWG

40

STRIPS

6-4 AWG

45

2-1/0 AWG

50

NEUTRAL LUG

6 AWG - 250 MCM

200

ENCLOSURE

14-2/0 AWG

120

GROUND LUGS

MAIN TERMINAL

8 AWG - 500 MCM

375

BLOCK

MAIN AND BRANCH

AS MARKED

AS MARKED

CIRCUIT BREAKERS

ON DEVICE

ON DEVICE

BUS BAR CONNECTOR TORQUE

BOLT SIZE

TORQUE (lb. in.)

#10

30

1/4

65

5/16

130

WARNING

To avoid electrical shock, fire and or explosion, always disconnect

primary power source before opening enclosure for inspection or

service.

Содержание LP1 Series

Страница 1: ...l as in damp wet locations indoors or outdoors LP2 Series panel boards are designed for use in Class I Div 2 Groups B C D Panel boards should be installed inspected maintained and operated by qualified and competent personnel Read entire instructions before starting installation of this product Contact your Crouse Hinds Sales Representative Crouse Hinds Customer Service or your Crouse Hinds Distri...

Страница 2: ...ons using typical wiring diagrams per Figure 2 Terminal Housing Conduit 2 Conduit 2 Cl 1 Div 1 Grp C D Within 18 Within 18 Cl 1 Div 1 Grp B C D Within 18 Within 18 Cl 1 Div 2 Not required Not required CAUTION To prevent external fire or explosion external conduit sealing fittings are required on all conduit entrances within 18 of the enclosure for enclosures when used in Class I Group B hazardous ...

Страница 3: ... 17 21 25 29 33 34 30 26 22 18 14 12 10 8 6 4 2 5 27 31 35 36 32 28 24 20 16 12 N 10 N 8 N 6 N 4 N 2 N 1 3 11 15 19 23 7 9 13 17 21 25 29 33 34 30 26 22 18 14 12 10 8 6 4 2 5 27 31 35 36 32 28 24 20 16 12 N 10 N 8 N 6 N 4 N 2 N C C SIZE PANEL ONLY PASSTHRU MCB MLO A B C W O GFI W GFI 2N 12N W O GFI W GFI 2N 12N A B A B C 2N N 6N N 8N N 4N N 10N N 12N N 2N N 6N N 8N N 4N N 10N N 12N N NEUTRAL C SIZ...

Страница 4: ...rtight but the breathers and drains are not hose tight GROUND FAULT CIRCUIT BREAKER GFCB INSTALLATION INSTRUCTIONS Connect the GFCB line neutral pigtail s to the breaker housing isolated neutral block This block is mounted to the chassis in the upper right section Select the load lead s on the branch terminal block in the terminal housing that correspond s to the circuit location number in the bre...

Страница 5: ...s operator plugs Changing present breaker pole combinations is solved by choosing the appropriate kit Before adding or removing any breakers see OPENING COVER section If adding breakers determine the quantity trip rating and number of poles for each Add or remove circuit breakers as necessary For Group B applications use only Cutler Hammer QBHW series for conventional breakers GFI EPD breakers are...

Страница 6: ...t is tight against cover interior using the LP K2 replacement cover plugs Securely tighten all cover bolts Use only bolts supplied with the panel board Start cover bolt threads by hand then torque all cover bolts to 25 30 ft lbs PANEL BOARD REPLACEMENT PARTS CAT NUMBER DESCRIPTION LP K1 Extra circuit breaker operator assemblies for single pole circuit breakers qty 3 LP K2 Replacement cover plugs f...

Страница 7: ...t le Code canadien de l électricité CCE ainsi que pour les emplacements intérieurs ou extérieurs humides et mouillés Les tableaux de la série LP2 sont conçus pour l utilisation dans les emplacements de Classe I division 2 groupes B C et D Les tableaux doivent être installés inspectés entretenus et exploités par du personnel qualifié et compétent Lisez attentivement toutes les instructions avant d ...

Страница 8: ...1 gr C et D Moins de 18 po Moins de 18 po Cl 1 div 1 gr B C et D Moins de 18 po Moins de 18 po Cl 1 div 2 Non exigé Non exigé ATTENTION Pour éviter le risque d incendie ou l explosion externes des coupe feu antidéflagrants externes sont exigés à toutes les entrées de conduits à moins de 18 po du boîtier pour les boîtiers dans les emplacements dangereux de Classe I groupe B Utilisez des coupe feu C...

Страница 9: ... 29 33 34 30 26 22 18 14 12 10 8 6 4 2 5 27 31 35 36 32 28 24 20 16 12 N 10 N 8 N 6 N 4 N 2 N 1 3 11 15 19 23 7 9 13 17 21 25 29 33 34 30 26 22 18 14 12 10 8 6 4 2 5 27 31 35 36 32 28 24 20 16 12 N 10 N 8 N 6 N 4 N 2 N C Tableau de calibre C seulement Passage MCB MLO A B C Sans GFI Avec GFI 2N 12N Sans GFI Avec GFI 2N 12N A B A B C 2N N 6N N 8N N 4N N 10N N 12N N 2N N 6N N 8N N 4N N 10N N 12N N Ne...

Страница 10: ...ent Placez le répertoire des circuits dans la chemise en plastique transparent avant de l insérer sur son support NOTA Les tableaux de la série LP doivent être protégés pendant les opérations d arrosage au boyau Les panneaux sont étanches mais les évents et les purgeurs ne le sont pas INSTRUCTIONS D INSTALLATION DES DISJONCTEURS DE FUITE À LA TERRE GFCB Reliez les raccords flexibles neutres du GFC...

Страница 11: ...actionneurs de disjoncteurs servent à modifier la configuration d un tableau LP K1 comprend des actionneurs pour disjoncteurs unipolaires et LP K3 des actionneurs pour disjoncteurs GFI EPD bipolaires et tripolaires tandis que LP K2 comprend des bouchons d obturation Il suffit de choisir l ensemble approprié pour modifier la combinaison actuelle des pôles de disjoncteurs Avant d ajouter ou d enleve...

Страница 12: ...actionneur à l aide de la rondelle de blocage et de la vis fournies de manière que le contre alésage soit tourné vers le haut et que l extrémité courte soit tournée vers le centre du compartiment de disjoncteurs AJOUT DE BOUCHONS Enlevez l actionneur du disjoncteur et à l aide d un lubrifiant pour filets à base de produits non pétroliers vissez le bouchon jusqu à ce qu il soit serré contre l intér...

Страница 13: ...así como en lugares interiores y exteriores mojados y húmedos Los tableros Serie LP2 están diseñados para utilizarse en Clase I Div 2 Grupos B C D Los tableros deben instalarse inspeccionarse mantenerse y operarse por personal calificado y competente Lea todas las instrucciones antes de empezar la instalación de este producto Si tiene cualquier duda llame a su Representante de Ventas Crouse Hinds ...

Страница 14: ...zando los diagramas típicos del alambrado de la Figura 2 Cubierta de la Terminal Tubería 53 2 Tubería 53 2 Cl 1 Div 1 Grp C y D Dentro de 46 cm Dentro de 46 cm Cl 1 Div 1 Grp B C y D Dentro de 46 cm Dentro de 46 cm Cl 1 Div 2 No se requiere No se requiere PRECAUCIÓN Para prevenir fuego exterior o explosión los accesorios para sellar la canalización de tubería externa se requieren en todas las entr...

Страница 15: ...21 25 29 33 34 30 26 22 18 14 12 10 8 6 4 2 5 27 31 35 36 32 28 24 20 16 12 N 10 N 8 N 6 N 4 N 2 N 1 3 11 15 19 23 7 9 13 17 21 25 29 33 34 30 26 22 18 14 12 10 8 6 4 2 5 27 31 35 36 32 28 24 20 16 12 N 10 N 8 N 6 N 4 N 2 N C SOLO TABLERO TAMAÑO C Passthru MCB MLO A B C W O GFI W GFI 2N 12N W O GFI W GFI 2N 12N A B A B C 2N N 6N N 8N N 4N N 10N N 12N N 2N N 6N N 8N N 4N N 10N N 12N N NEUTRO SOLO T...

Страница 16: ...io del circuito localizada en la cubierta de la caja de unión con las descripciones adecuadas para cada número de circuito derivado Coloque la tarjeta del directorio del circuito dentro de la cubierta de plástico transparente antes de insertarla en su contenedor NOTA Los tableros de la Serie LP deben estar protegidos durante las operaciones bajo manguera Estos tableros son herméticos al agua pero ...

Страница 17: ...cos únicamente con interruptores Cutler Hammer como sigue INTERRUPTOR TERMOMAGNETICO 240 120 120 208 Vc a Corriente max A Tipo de interruptor Retroalimentación 100 BAB principal Derivado 35 GFI o EPD 30 QBHGF QBHGFEP 5 Nosotros recomendamos un programa de Mantenimiento Preventivo Eléctrico como se describe en el Boletín de la National Fire Protection Association NFPA No 70B ADICIÓN O REMOCIÓN DE I...

Страница 18: ...o doble de la flecha de operación hasta que la bobina pequeña se asiente contra la porción del circuito de la flecha 5 Enrosque la flecha desde el interior de la envolvente por la entrada adecuada del operador hasta que ya no pueda girarse 6 Regrese la flecha una o dos vueltas para que el anillo elastomérico en forma de O no quede expuesto La sección cuadrada de la flecha debe estar encima de la s...

Отзывы: