Chamber Start-Up and Operation
5-2 February 2016 | 256574-ENG
R01
5.2 Operation
5.2.1 Drip
Pan
Check the plastic drip pan under the chamber daily, and empty as required, to ensure the
collected condensation does not overflow.
5.2.2 Fresh & Exhaust Air Connections
A1000 reach-in chambers are equipped
with a damper for fresh and exhaust air
exchange (Figure 5-2). A single lever
located inside the chamber chamber
adjusts both the intake and exhaust air
simultaneously. Check and adjust the
damper, as required, before every
experiment.
A1000 chambers require adapters to the
mechanical dampers located on the
chamber roof. Connect to a building
central exhaust or fresh air supply.
Figure 5-2
Damper Adjustment Lever
5.2.3 Additive
Humidity
All A1000 reach-in chambers offer added
humidity as a standard feature. The mist
is generated using ultrasonic humidifiers
capable of providing a fine mist without
the need for high pressure systems that
require maintenance.
A connection to a purified water source is
required when additive humidity is to be
used (Figure 5-3).
Refer to the
included controller manual for
instructions to adjust the humidity, and to the
Technical Specifications section for
details.
Figure 5-3
Water Connection
To ensure no damage was incurred during transportation, operate your CONVIRON
equipment for a minimum of 5 days before introducing any research material.
Содержание ADAPTIS A1000
Страница 1: ...A1000 INSTALLATION OPERATION MAINTENANCE MANUAL 256574 ENG R01 ...
Страница 14: ...Precautions 1 4 February 2016 256574 ENG R01 ...
Страница 46: ...Kit Installation 2 32 February 2016 256574 ENG R01 ...
Страница 54: ...Chamber Start Up and Operation 5 4 February 2016 256574 ENG R01 ...
Страница 63: ......