2.5.2.3 Installing the Wire Shelves
The wire shelves must be installed according to the desired growth height. The lowest possible
position for the bottom shelf, Item G, is above the bottom row of holes in the back wall plenum, as
shown in Figure 2-36.
To install the wire shelves:
1. Place the four (4) bottom shelf
supports, Item F into the slots in the
side wall by inserting the top part of
the clip into the desired slot and press
lightly on the bottom to snap it into
position.
2. Continue to install the rest of the shelf
supports in each side wall at the
desired height.
3. Place the wire shelf with the lamp
supports, Item G, over the clips
(Figure 2-36).
4. Repeat for the remaining shelf.
The chamber is now ready to operate.
Read the startup Instructions carefully
before proceeding with the start up.
Figure 2-36
AR Bottom Shelf Location and Supports
Detail
Figure 2-37
AR Kit Installed
G
F
The maximum operating levels of light for this kit must be set at the controller. To edit
the factory default setting, refer to the included controller Operator’s Manual.
Содержание ADAPTIS A1000
Страница 1: ...A1000 INSTALLATION OPERATION MAINTENANCE MANUAL 256574 ENG R01 ...
Страница 14: ...Precautions 1 4 February 2016 256574 ENG R01 ...
Страница 46: ...Kit Installation 2 32 February 2016 256574 ENG R01 ...
Страница 54: ...Chamber Start Up and Operation 5 4 February 2016 256574 ENG R01 ...
Страница 63: ......