
414L-M-V3
3.2.1 Control Relay Outputs
The two output relays can be set up to a control single valve or a dual valve
with slow stop and/or slow start. Alternatively, the second relay can be used
to control a pump.
The relay operation is shown on the previous two pages.
A time delay between the Start and the time when relay 2 energises can
be programmed to provide a soft startup. The delay can range from 0
(no delay) to 79 minutes and 59 seconds.
A Prestop quantity (ie. the quantity to the end of the batch) can also
be programmed to provide a slowdown of flow at the end of the batch,
thereby enabling precise quantities to be batched.
The process can be stopped at any time by pressing the STOP key, whereby
both relays will immediately de-energise. The process can then be aborted
and the batcher reset by pressing the STOP key again, or the process
continued by pressing the RUN key.
If the process is continued and the instrument was previously in the slow
start or main control phases (ie. not the prestop phase), the timer will be
reset and a slow start will occur with a full time delay to ensure a correct
start up. The totals will not be reset and the batch quantity will remain
unchanged.
Operation
17
Содержание 414L
Страница 1: ...414L M V3 BATCH CONTROLLER MODEL 414L September 2013 ...
Страница 2: ...414L M V3 ...