Mounting and alignment of the vertical sections:
Use the brackets for the upper flow sheets
as spacers (the bracket with system-specific
width is marked with a “V”)
Drain-off
sheet left
Drain-off sheet with system-specific
width (marked with a ”V”)
Drain-off sheet right
11. Use the clamping brackets to fix all vertical sections to the cross arms
and temporarily align them according to the installation drawing pro-
vided.
Note
: Tighten the clamping brackets only to a point at which the vertical
sections can still be moved.
Important!
The openings of the sections to the very left and right must
face the duct wall.
Push the vertical section to the very left towards the duct roof until it
comes to a stop, then align it at a distance of 50 mm parallel to the duct
wall. Finally, fasten the screws of the respective clamping brackets.
Hang all drain off sheets into the vertical sections and push them down
to the very stop.
Important!
The drainoff sheet with systemspecific width (marked with
a “
V
”) must be mounted in the corresponding interstice (see installation
drawing provided).
Содержание Dual 2
Страница 1: ...INSTALLATION AND OPERATING INSTRUCTIONS Hybrid Humidifier 1120506 EN 1308 Condair Dual 2...
Страница 2: ......
Страница 78: ...Notes...
Страница 79: ...Condair Ltd Printed in Switzerland Technical modifications reserved...