18
First fix the two vertical mounting rails on both sides in the duct (see instal
-
lation drawing for positioning and fixing).
Important!
Use exclusively the fixing materials provided. If this is not pos
-
sible in your case, make absolutely sure that the fixing holes
are correctly
sealed from the inside of the duct with suitable components.
3. Fix the horizontal mounting rails to the connector plates using the screws
and sliding nuts provided.
4.
In ducts being wider than 2 m
:
– connect all the adjacently positioned horizontal mounting rails (at
the centre, if possible) using the profiled screwed connector/s pro
-
vided.
– mount the vertical strut/s between the horizontal mounting rails at
the specified position.
– mount the supplied ceiling attachment and bottom support to the duct
ceiling and the duct bottom using the self-tapping screws provided
(first drill the ø3.3 mm holes).
1. Mark the positions of the holes for the fixing straps on the duct wall and
drill the ø3.3 mm holes.
Important!
Make sure that the
fixing holes
in the left and right duct
wall are
exactly aligned opposite each other
and that the axes of
the
upper and lower fixing holes are at right angles to the ceiling
of the duct
.
Then, fix the vertical mounting rails to the wall of the duct with the fixing
straps and screws provided.
2. Fix the connector plates to the vertical mounting rails using the screws
and sliding nuts provided.
1
2
3
ø3.3 mm
4
ø3.3 mm
ø3.3 mm
Содержание Dual 2
Страница 1: ...INSTALLATION AND OPERATING INSTRUCTIONS Hybrid Humidifier 1120506 EN 1308 Condair Dual 2...
Страница 2: ......
Страница 78: ...Notes...
Страница 79: ...Condair Ltd Printed in Switzerland Technical modifications reserved...