38
4.5
Water installation
Water installation of the centralized system
The following illustration shows the water installation of the centralized
system. Installations to be carried out are highlighted in grey.
Important! Read and observe the notes on water installation at the
end of the current chapter
.
1 Shut-off valve (by customers)
2 Filter (by customers, mesh width
0.005
mm)
3 Connector (G 1/2", outside thread) for fully demineralized water
4 Drain with siphon trap (by customers)
5 Flushing conduit (ø18/16 mm or Z409: ø12/10 mm)
6 Flushing connector (ø16 mm or Z409: G 1/2" outside thread)
7 Nozzle system connectors
8 Spray lines (ø10 mm)
9 Central unit
3
9
2
1
5
6
8
4
Y6
Y7
Y8
6 (
G 1/2")
Z409
G 1/2"
3 (
G 1/2")
8
7
Min. inner diameter = 15 mm
Pmin= 2 bar (working pressure)
Pmax= 10 bar
Tmax= 45°C
Conductance 0.5...15.0 µS/cm
ø10 mm
Lmax= 10 m
(ø16 mm)
Содержание Dual 2
Страница 1: ...INSTALLATION AND OPERATING INSTRUCTIONS Hybrid Humidifier 1120506 EN 1308 Condair Dual 2...
Страница 2: ......
Страница 78: ...Notes...
Страница 79: ...Condair Ltd Printed in Switzerland Technical modifications reserved...