44
Designation/Description
Cable specification
Connection of the
silver ionization
to terminal X24.
min. cross section 0,5 mm
2
Connection of an
external controller or humidity sensor
to terminal X25.
(admissible signal values see chapter 8.1 “Specifications”).
The shielding of the control signal must be connected to terminal X25/3.
Cau-
tion!
If the shielding of the control signal is
already connected to a po ten tial
or a grounded conductor, do not
connect it to terminal X25/3.
shielded cable
min. cross section 0,25 mm
2
4.7
First-time commissioning
The following steps are carried out upon first-time commissioning:
• Inspecting the electrical installation
EMC safety
: make sure all connecting cables to the control unit are
led through the two snap ferrites and the connecting cables connected
to terminals X23.14 and X24.12 are led through the two ring ferrites
inside the control unit additionally.
• Inspecting the water installation
• Flushing the water circuits
• Checking the spray nozzles
• Configuring the control unit or the system, respectively
• Carrying out test runs
• Setting up the ionization current and the capacity counter of the silver
ionization according to the table in the appendix.
Since first-time commissioning is always done by a service technician of
your Condair supplier the current manual does not provide de tail ed infor-
ma tion on this procedure.
The commissioning protocol with the system configuration data can be
found in chapter 9.2.
Содержание Dual 2
Страница 1: ...INSTALLATION AND OPERATING INSTRUCTIONS Hybrid Humidifier 1120506 EN 1308 Condair Dual 2...
Страница 2: ......
Страница 78: ...Notes...
Страница 79: ...Condair Ltd Printed in Switzerland Technical modifications reserved...