
DIGITAL PowerStorm 1000 Graphics Subsystem Owner's Guide 4–1
4
Upgrading the Subsystem
4.1 Introduction
There are two upgrade options available for the PowerStorm 1000 graphics subsystems.
An entry PowerStorm 1000 graphics subsystem can be upgraded to a full PowerStorm
1000 and a full PowerStorm 1000 graphics subsystem can be upgraded to a high resolution
PowerStorm 1000.
Table 4-1 lists the upgrade options available for the PowerStorm 1000 graphics subsystems
along with a description.
Table 4-1 Upgrade Options
Option
Description
SN-PBXGM-UA
For upgrading an entry PowerStorm 1000 to a full PowerStorm 1000
SN-PBXGM-UB
For upgrading a full PowerStorm 1000 to a high resolution PowerStorm
1000
An entry PowerStorm 1000 graphics subsystem can also be upgraded to a high resolution
PowerStorm 1000 by ordering and installing both of the options listed in Table 4-1.
________________________WARNING __________________________
Before servicing the PowerStorm 1000 graphics subsystem, ensure that the
power On/Off switch on the front of the deskside chassis is in the OFF
position and disconnect the deskside chassis power cord from the ac input
receptacle.
____________________________________________________________