V30/30 DISTRIBUTION PANEL
SETUP AND OPERATION MANUAL
PAGE 4 - INSTALLATION
4.2 Mounting
NOTICE
THIS PRODUCT MUST bE INSTALLED WITHIN A RESTRICTED
ACCESS LOCATION WHERE ACCESS IS THROUGH THE USE
OF A TOOL, LOCK AND KEY, OR OTHER MEANS OF SECURITY,
AND IS CONTROLLED bY THE AUTHORITY RESPONSIbLE
FOR THE LOCATION. THIS PRODUCT MUST bE INSTALLED
AND MAINTAINED ONLY bY QUALIFIED TECHNICIANS.
Step 1.
Attach the
(3)
cable lacing bars to the threaded inserts found on the rear of the
chassis using the included 12-24 hardware
(see Figure 2).
Step 2.
Secure panel to equipment rack by tightening the included 12-24 hardware
into the mounting ears
(see Figure 3)
.
4.3 Chassis Ground
CAUTION
DO NOT ENERGIZE THE PANEL bEFORE
CHASSIS GROUND IS CONNECTED.
The chassis ground is located in the side of the panel. A two hole lug landing position
is provided. See table below for termination information. A minimum of #6 AWG chassis
ground cable is required.
IMPORTANT: Grounding hardware not included. A properly-sized grounding
conductor must be installed per NEC (250.122).
TAbLE 2. CHASSIS GROUND TERMINATION SPECIFICATIONS
TERMINATION
TYPE
HOLE/STUD
SIZE
CENTER TO CENTER
RECOMMENDED TORQUE
VALUE
Threaded Insert
1/4 in.
5/8 in.
75 in∙lbs
Step 1.
Secure the ground cable to the chassis by tightening 1/4 in. hardware
(see
Figure 4)
.
Figure 3. Rack Install
Figure 2. Lacing bars
Figure 4. Chassis Ground
Содержание v30/30
Страница 1: ...SETUP AND OPERATION MANUAL F O R T E L E C O M B R O A D B A N D v30 30 Distribution Panel...
Страница 3: ...SETUP AND OPERATION MANUAL F O R T E L E C O M B R O A D B A N D v30 30 Distribution Panel...
Страница 6: ...V30 30 DISTRIBUTION PANEL SETUP AND OPERATION MANUAL PAGE vi THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 14: ...V30 30 DISTRIBUTION PANEL SETUP AND OPERATION MANUAL PAGE 8 Installation THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 29: ...THIS PAGE INTENTIONALLY LEFT BLANK...