IGS-NT Installation Guide
85
9.8. InteliMains
– FDR Application
9.8.1.
BaseBox controller
Bus V meas
BI
1
BO
A1
AI COM
A2
A3
Load V meas
2 3 4 5 6
7 8 9 10 11 12
9 10 11 12 + -
1 2 3 4 5 6 7 8
+
-
L1k L1l L2k L2l L3k L3l LNk LNl
AOUT+
AOUT COM
LC
B
F
EE
D
B
A
C
K
LC
B
D
IS
A
B
LE
IS
SU
EA
C
TC
A
LL
C
1
A
C
C
ES
SL
O
C
K
IN
T
R
EM
O
TE
O
FF
W
A
R
N
IN
G
8
W
A
R
N
IN
G
9
W
A
R
N
IN
G
1
0
B
R
EA
K
ER
O
P
EN
1
1
FO
R
C
EV
A
LU
EI
N
1
K
L
k
l
K
L
k
l
K
L
k
l
H
O
R
N
A
LA
R
M
B
U
SR
P
A
R
A
M
S
O
K
B
U
SL
P
A
R
A
M
S
O
K
B
TB
C
LO
SE
/O
P
EN
+
-
Monitoring
Analog
control
LCB
L1
L2
L3
N
BUS
L1
L2
L3
N
P
U
LS
EC
O
U
N
TE
R
1
Load
Aux Curr
Meas
N
OTE
:
Binary Input LCB
FEEDBACK
and Binary Output LCB
O
PEN
/C
LOSE
are the only compulsory BI
and BO in this application. Other Binary Inputs and Outputs in the schematics are only
recommended or suggested for basic and advanced functions of the controller.
Содержание IG-NT
Страница 24: ...IGS NT Installation Guide 24 5 2 3 InteliVision 5 5 2 4 InteliVision 8...
Страница 75: ...IGS NT Installation Guide 75 9 Recommended Wiring 9 1 SPtM application...
Страница 76: ...IGS NT Installation Guide 76 9 2 SPI application...
Страница 77: ...IGS NT Installation Guide 77 9 3 MINT application...