11
Page 11 of 24 M7819 Issue 4.2
7.3.
Warming Pre-packaged Food:
Ensure the Control Panel Toggle Switch is in the
OFF position. Remove the Inner Container and fill the HW & R with potable water up
to the LOWER LEVEL LINE (1.18 litres) maximum. Place the pre-packaged food
pouches into the Inner Container and add sufficient potable water to cover. Replace
the Inner Container into the HW & R.
Note:
Always check the vent hole in the cover is clear before closing the cover.
Close the Cover, ensuring the latch is secure.
Switch the Toggle Switch to the ‘LO’ position and the operational sequence will
commence as detailed in the table below.
Stage. Panel Indication.
Status.
Definition.
1.
Power On
Boil Cycle
Heater On
LED On – Green.
LED Off.
LED On – Yellow
Water is heating towards set point of
68
°
C
2.
Power On
Boil Cycle
Heater On
LED On – Green.
LED Off
LED Off
Water is at 68
°
C set point. Heater
turns off.
Note: Stage 1 & 2 above will cycle continuously until Toggle Switch is operated.
The HW & R can be switch off at any time by returning the Toggle Switch to the OFF
position.
When the hot food is required, switch the Toggle Switch to the OFF position.
Take care and use gloves or other hand protection as necessary, remove the Cover,
Inner Container and the pre-packaged food. If required discharge the remaining
volume of hot water into an appropriate container by operating the tap.
DO NOT OPEN THE COVER IF THE PRESSURE RELIEF VALVE IS
‘HISSING’ OR VENTING STEAM. ALWAYS VENT WATER THROUGH THE TAP
BEFORE OPENING THE COVER. PRESSURISED BOILING WATER CAN
SERIOUSLY SCALD.
Содержание Electrothermal RAK30 HW & R
Страница 22: ...12 NOTES 22...
Страница 23: ...23 12 NOTES...