Axis Adjustment Procedure for X and Y
At this point, the machine is roughly assembled needing final adjustments.
1. X axis
–
move the axis with the drill and let it self align. It may stick at first but it will improve with each
movement. Put a light film of lithium based grease on the dovetails (both sides) and spread some on the ball
screw just on each side of the ball nut. Be generous with the grease.
2. Now move the axis all the way to one end and just snug the bolts on the table end plate. Then move it in the
other direction until it is at the other end of the table. Snug the bolts on that table end plate.
3. Repeat the process several times before making the final tightening of the bolts.
4. It is now time to tighten the bolts that are holding the X axis ball nut mount. These are locate under the table to
the right of the Y axis cross-slide. You will need a long hex key wrench and a pair of pliers or a small adjustable
wrench (Cresent Wrench) to tighten.
5. Your axis should now be ready to mount the stepper.
Содержание Seig X2
Страница 1: ...Assembly Instructions for Seig X2 and X2D Benchtop Mini MIll...
Страница 18: ......
Страница 23: ...Some grinding may be required...
Страница 27: ...The column clamp bar is already inside the column...