The kit will arrive assembled. All thrust bearings will be adjusted. Note: thrust bearings are designed to
eliminate or reduce axial slack. They are not intended to be over tightened. They are pre-set in assembly.
The stepper motor can be mounted on either end. As delivered, it is set up to be on the left side of the table
(looking at the machine). If you decide to move the stepper motor to the fight side, you will have to reverse
the direction of the ball nut. You must be very careful when removing the ball nut from the ball screw using
the carboard tube supplied. You will have to unscrew the nut from the ball screw onto the cardboard tube to
assure that you do not let any of the .125” diameter ball bearing from the nut. Please watch the following
video if you decide to move the motor to the other side of the table.
https://www.youtube.com/watch?v=5lN-bS3OQXY
At final assembly, apply a generous coat of lithium based grease on the entire length of each ball screw and
the thrust bearings.
If you machine has a lift assist device for the head, it must be removed. (directions to remove lift assist In the
following slides.
Содержание Seig X2
Страница 1: ...Assembly Instructions for Seig X2 and X2D Benchtop Mini MIll...
Страница 18: ......
Страница 23: ...Some grinding may be required...
Страница 27: ...The column clamp bar is already inside the column...